Forum quick links
Problems with v4v4 1_Indoor Water Use Reduction Calculator_v05.1.xlsm
Schools-NC-v4 WEp2:Indoor water use reductionposted by Alexia Anastassiadis on
Hi all!
Biophilic Design as a Guiding Principle in Sustainable Design
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Carla Roubaud on
Securing this credit goes beyond ticking boxes; it requires thoroughly blending natural elements into the architecture.
Shower in Mixed Use Residential/Retail
NC-v4 LTc6:Bicycle facilitiesposted by Michelle Rosenberger on
I am confused about the shower requirement in a residential building that has retail space on the ground floor.
LEED v4 Heat Island Reduction - include elevator shafts and stairwell enclosures in roof calcs?
NC-v4 SSc5:Heat island reductionposted by Julie Baines on
Hi all, I am working on a major renovation of an existing downtown campus building. The entire roof of the building is being redone with white TPO.
Location of outside airflow measuring station inside the HVAC unit
CI-v4 EQp1:Minimum indoor air quality performanceposted by Edgar Arevalo on
We have a 100% outside air HVAC with an energy recovery wheel serving the entire the project space. Since there is no recirculating air getting reintroduced to the supply side, the MEP engine
Runoff calculation - typical values for infiltration loss
NC-v4 SSc4:Rainwater managementposted by G.J. Teunissen on
Hi,
What are the standard values for the infiltration losses in the equation below for rainwater management credit? eg: previous pavements and vegetated roof.
How to claim "NC-v4 EAc3 - Advanced energy metering" credit for Villas
NC-v4 EAc3:Advanced energy meteringposted by QUANG DOAN on
Before diving deep into the question, to gain more insight into the project, please read the following overview:
Option 2 Path 1 - any experience to share?
NC-v4.1 LTc3:High Priority Site and Equitable Developmentposted by Emily Purcell on
Hi LEED users! We had a thread in this forum back in 2022 about Option 2 Path 1, with a lot of good ideas for how to potentially earn the credit.
One Tenant - two spaces across a public corridor - can this be certified as one project?
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Helen Kessler on
The tenant is located in a large multi-tenant building and has two leased spaces which are separated by a public corridor. Seems to me this is no different from a tenant that is on multiple l
EPD Stud - Separate products count towards 20+ goal under 1 EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Allison Para on
Hello LEED Pros,