Forum quick links
posts on original LEED-HC forum
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Tristan Roberts on
For everyone's reference, there are a number of forum posts that were made to LEEDuser's general LE
posts on old forum
Healthcare-v2009 IEQc8.2:Daylight and views - viewsposted by Tristan Roberts on
Before LEEDuser set up these credit-specific Healthcare forums, there was a general Healthcare forum on which this IEQc8.2 question was posted. I am reposting the Q&A here for convenience:
post on old forum
Healthcare-v2009 MRc4.2:PBT source reduction - lead, cadmium and copperposted by Tristan Roberts on
Before LEEDuser set up these credit-specific Healthcare forums, there was a general Healthcare forum on which this MRc4.2 question was posted. I am reposting the Q&A here for convenience:
post on older LEED-HC forum
Healthcare-v2009 MRc5:Furniture and medical furnishingsposted by Tristan Roberts on
Before LEEDuser set up these credit-specific Healthcare forums, there was a general Healthcare forum on which this MRc5 question was posted. I am reposting the Q&A here for convenience:
here is another post from the older LEED-HC forum
Healthcare-v2009 MRc4.2:PBT source reduction - lead, cadmium and copperposted by Tristan Roberts on
Q: In regards to the following statement, as part of the MRc4.2 requirements:
repost from older HC forum
Healthcare-v2009 IEQp1:Minimum indoor air quality performanceposted by Tristan Roberts on
Before LEEDuser set up these credit-specific Healthcare forums, there was a general Healthcare forum on which this IEQp1 question was posted. I am reposting the Q&A here for convenience:
Too many densely occupied spaces
CI-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Rubén M. R. on
Hello everyone, I am working on a three-level commercial office project.
Heating setpoint - no heating system
NC-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi, I have a doubt on how to establish the heating setpoint for an HVAC system which has no heating system. In a specific project, I have only cooling system serving conditioned areas.
Equipment discrepancy for Owner's project requirements vs. Model
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
Our Campus Application CS mixed use/office project uses a common HVAC (district energy) system. The Owner's program required 100 s.f. per ton for the retail areas and 300 s.f.
Ballast
Retail-CI-v2009 EAp2:Minimum energy performanceposted by John Kitsalis on
Hello, My question concerns the topic of Watts per luminaire. I am to determine how many Watts there are per luminaire.