Should parking counts include handicap stalls?
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Tracy Baker on
Parking counts for the school project I am working on include handicap stalls. It appears that based on comments I have received based on the review that handicap stalls are not allowed?
Template (v3) question
Schools-2009 IEQc6.1:Controllability of systems - lightingposted by Todd Bundren on
Does anyone know how to erase a line item from the tables without deleting all of the entries below?
different concrete classes
CS-2009 MRc4:Recycled contentposted by Alicja Bieszyńska on
Not sure how it looks in the US, but in Europe we have different concrete classes depending on its strength and - what goes along with that - different material ratio.
Below Grade Garage Exhaust with CO Monitoring
NC-2009 EAp2:Minimum energy performanceposted by Lorey Flick on
Condition: I have a completely unconditioned garage located in the cellar. There is no heating. No cooling.
Pursuing EBOM IEQc2.4: Daylight and Views as NC ID credit
NC-2009 IDc1:Innovation in designposted by Janene Bolt on
In our LEED 2009 NC project, can we pursue EBOM IEQc2.4: Daylight and Views, (Using Option 2 Dayligting) as an Innovation in Design credit even though a similar credit already exists in the NC rati
product names in the Template
CS-2009 MRc5:Regional materialsposted by Alicja Bieszyńska on
Does anyone know how detailed we should be when filling up the MRc5. Template's table? I mean, should I write "reinforcement steel", "steel beams", "steel railing" etc. or just "steel"?
90.1 compliance mandatory? Planned use of empty space?
NC-2009 EAp2:Minimum energy performanceposted by David Weigel, PE on
Sorry for a couple of elementary questions, but my searches haven't been successful. 1. Is 90.1 compliance required, or only the mandatory provisions? 2.
Spreadsheet for Data Centers
NC-2009 EAc1:Optimize energy performanceposted by Ricardo Marques on
Hi, I can´t find the spreadsheet “A Data Center Power Train 1-150170-11A”. I want the latest version the spreadsheet available.
EAp2 Section 1.6
NC-2009 EAc1:Optimize energy performanceposted by Loren Keith Aiton on
We have an extremely large site are to building area ratio. The building covers only 2% of the site.
Water from a river
EBOM-2009 WEc3:Water efficient landscapingposted by Anna Korinkova on
Dear all, our project is very near to a river and our client is proposing to make a 25m deep drill and pump water (which is not potable due to the river) and use it for irrigation purposes.