Forum quick links
NC project schedule overlap with EBOM performance period?
EBOM-2009 SSc1:LEED certified design and constructionposted by Tiffany Moore on
I'm working with a project team that had planned to certify their facility under NC and follow immediately with a performance period for EBOM certification.
tenant compliance required?
EBOM-2009 MRp2:Solid waste management policyposted by Jill Ziegler on
Can anyone elaborate on the following credit language?
Help with a new study of green water technologies!
NC-2009 WEp1:Water use reductionposted by Chris Pyke on
The Water Research Foundation and Virginia Tech have partnered for a study on the unanticipated consequences of green water technologies and practices on water use in buildings.
Permeable areas
EBOM-2009 WEc3:Water efficient landscapingposted by Lourdes Salinas on
I'm curious on what everyone thinks about permeable areas covered with gravel; are these considered landscape areas and account for the 5% landscape area requirement?
FIre Station Apparatus Bay
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Chris Mullinax on
I'm working on a FIre Station with a 7500 sq. ft. apparatus bay. The bay is approximately 75' X 100' with (3) 195 sq. ft. doors on each of the long ends (6 doors total). Ceiling Height is 20'.
The Correct Limit of VOC to Use
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Abdulrahman Sherazy on
Good morning friends, I would like to understand how to use the table SCAQMD Rule 1113 to know the VOC limit in any material in general, and in floor coating specifically.
EAc1: equivalence energy calculation for french project ???
NC-2009 EAc1:Optimize energy performanceposted by Nicolas MOLLE on
Hello, I'd like to know if anyone can appreciate the levl of results for a french project under ASHRAE ?
New & exisiting space and minimum requirements?
NC-2009 EAp2:Minimum energy performanceposted by Chris Miller on
I have a project that is an exisiting building renovation with an addition. I understand my energy model will be based on a combination of the new & existing.
How to document a pre-rinse spray valve in the form online????
NC-2009 WEp1:Water use reductionposted by Robert Robison on
Review comments have requested that I include the pre-rinse spray valve in the hotel kitchen in my water usage calculations.
Default worst-case VOC Values?
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Erin Holdenried on
We have an international project for which all of the paints and coatings used are proven compliant, except one latex wall primer.