Anyone submitted this for review yet?
Pilot-Credits IPpc93:Prevention through Designposted by emily reese moody on
Like Logan's post below, we are pursuing this Pilot Credit, but feel it would be especially useful to know how much information/detail they expect for each line item required.
Using Autocase to document SSpc113
Pilot-Credits SSpc113:Informing Design Using Triple Bottom Line Analysisposted by Jennifer Wehling on
We used Autocase to document this pilot credit.
Hardscape Underneath a Cantilevered Terrace
NC-v4 SSc5:Heat island reductionposted by Crista Shopis on
Hello,
Design for Indoor Air Quality and Infection Control Documentation
Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Controlposted by Katherine Tich on
Anyone with experience documenting this credit - did you submit with the design credits or with the construction credits?
Clarification and Application of LEED v4 for District Energy Systems Using the Large-Scale DES Calculator
NC-v4 EAp2:Minimum energy performanceposted by G.J. Teunissen on
I am working on a building project in the Netherlands that will utilize district heating.
ASHRAE 90.1.2010 and receptacle loads
NC-v4 EAc2:Optimize energy performanceposted by Konstantina Kalliakoudi on
Hello to all,
I have following questions concerning ASHRAE 90.1.2010 and receptacle loads:
Is this runoff volume calculation correct?
NC-v4 SSc4:Rainwater managementposted by SOYOUNG CHO on
Hello everyone,
Schedule for Lighting, Occupancy, & Plug Loads
NC-v4 EAp2:Minimum energy performanceposted by junaid naseer on
We are working on a Hospital Project outside USA and we are going though option 1 i.e. whole building energy simulation.
According to ASHRAE 90.1, Is it mandatory to install occuppant sensors in electrical and mechanical rooms?
NC-v4 EAp2:Minimum energy performanceposted by Sara BENLOUBA on
According to ASHRAE 90.1 / Section 9.4.1.2 , Do we have to install occupant sensor or a timer switch in electrical and mechanical rooms?
Thanks,
Stakeholder Engagement
Pilot-Credits INpc122:Informing Design by Major Credit Category Using Triple Bottom Line Analysisposted by Mansoureh Jalali on
What strategies or best practices can help project teams engage stakeholders in the Triple Bottom Line analysis to ensure diverse perspectives and comprehensive results?