Forum quick links
Case 2 Demand Response Capable Building with a "future" program
NC-v4.1 EAc4:Grid Harmonizationposted by Chris Flint Chatto on
Is case 2 only available to projects with utilities that don't have DR programs? under v4.0, this was clearly the case ("Case 2.
Sound Isolation ACP?
NC-v4 EQc9:Acoustic performanceposted by Brightworks Sustainability on
HI all, is anyone familiar with an alternate option for complying with the sound isolation requirements?
Option 2 - Carshare, requirements
NC-v4.1 LTc7:Reduced Parking Footprintposted by Ricardo Sá on
Dear All,
I have a question regarding Option 2 – Carshare.
Sensor Control in Guardhouses
CS-v4.1 EAp1:Fundamental Commissioning and Verificationposted by Emiliano Ortega on
Hello,
Would a guardhouse require an occupancy sensor to control the lighting of the space?
Arbitrage option
CS-v4 EAc5:Renewable energy productionposted by Beth Brownlie on
When using the "arbitrage" option, is there a limit regarding where, geographically, the replacement RECs can be purchased form?
What consultants are included in a design contract?
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Rebecca Holt on
Can anyone confirm what consultants should be included in the design contract?
Point distribution in Innovation credit
NC-v4 INc1:Innovationposted by Ahmed Abdul Rahman on
Hallo All,
I have a question about INc1.
Receptacles in multifamily midrise building
Pilot-Credits SSpc129:Comprehensive Compostingposted by Emma McKay on
Hi all,
ENERGY STAR equipment
CI-v4 EAc2:Optimize energy performanceposted by Michael d on
Do laptops need to be included within this list?
Combining number of trips
NC-v4.1 LTc5:Access to Quality Transitposted by Ahmed Abdul Rahman on
Hello All,
I am doing calculations fro the Access to Quality Transit.