Forum quick links
About the 1/4 mile distance
CS-2009 SSc4.1:Alternative transportation - public transportation accessposted by Guillermo Hernandez Espinoza on
Our project has access to 2 bus stops, 1 located just outside of the building's perimeter with 2 bus lines and the other one is the main one, whit main it means that's the one the 90% of the people
I'm working on finalizing
CI-2009 EAc1.1:Optimize energy performance - lighting powerposted by Heather Anderson on
I'm working on finalizing documentation for a LEED project. We have completed the calculations and are only looking about 15% savings.
Aggregating data
CS-2009 MRc4:Recycled contentposted by Eeshoo Rehani on
One LEED site boundary has two individual LEED projects that are under construction under one contract by the same GC.
WEc1
CI-2009 WEc1:Water use reductionposted by Linda Delair on
As 1.6 is a standard low flow toilet, in order to further reduce water use is it better to specify a 1.28 gpf or a dual flush toilet? Thank you.
Pilot Credit 9
Pilot-Credits PC9:Street Networkposted by Jeffrey Lewis on
I'm not sure why this point is necessary, to be completely honest.
LEED CS v2009 certified building
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Aaron Yorke on
Hi all, We have a small LEED:CI project in a CS certified shopping mall. We don't have any direct outdoor air intakes, we take the air from the main atrium and give it to our space.
In a LEED certified building
CI-2009 SSc2:Development density and community connectivityposted by Aaron Yorke on
Hi all, We have a CI project in a CS v2009 certified project which achieved the development density points.
Pilot Credit
Pilot-Credits EApc3:Medical and process equipment efficiencyposted by Dan Forino on
If we have a LEED Project that was pursuing a Pilot Credit but without knowing that it was a Pilot Credit, and are at the Submission Phase can we still apply for this credit.
Material valuation system - BASTA
Pilot-Credits MRpc54:Avoidance of chemicals of concernposted by Tanja Arnesson on
In Sweden we use a material valuation system that is called BASTA, this system is only for chemicals.
Sampling Rate
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Ehsan Baharvand on
Hi, I have an issue with regard to CO2-metering in practice.