Forum quick links
Servers installed by clients
CI-2009 EAp2:Minimum Energy Performanceposted by Yong Lee Low on
For data centres, where the space is leased out to clients to install their own servers and the management does not have control on server selection,can we exclude these servers from our energy sta
Performance Option and 10% Power Density Reduction
CI-2009 EAp2:Minimum Energy Performanceposted by Luis Miguel Diazgranados on
Hi everyone I'm kind of confused because the explanation on the Bird's Eye View differs from the Credit Language's one.
Spanish Lighting requirements
CI-2009 EAp2:Minimum Energy Performanceposted by MARIA GARCIA on
Dear all, We have a CI project for 3 floors of a existing building. The scope of work includes the lighting and we have a problem with comply with ASHRAE.
Lighting Power Density: ASHRAE Lighting Compliance Documentation
CI-2009 EAp2:Minimum Energy Performanceposted by elizabeth warlop on
Hello, Our project is a small 1300 sqft office space. The only adjustments the clients are making to the lighting is that they are adding task lighting to the newly fabricated work stations.
Occupancy Sensor
CI-2009 EAp2:Minimum Energy Performanceposted by Simon Sue on
We have a project which has a big " function" area . this particular area is for employees to hang out + meet up with customers + briefing area (with a formal meeting table, projectors).
EAPr2 - Lighting Control (shut-off control and space control)
CI-2009 EAp2:Minimum Energy Performanceposted by Ramesh Narayanan on
Could you please anybody elaborate what is the difference between the shut-off device control requirement and speace control device requirement mentioned in the Ashrae standard lighting mandatory p
ASHRAE 90.1-2007 Lighting Compliance Documentation
CI-2009 EAp2:Minimum Energy Performanceposted by Natalie Terrill on
Page 3 of the ASHRAE Lighting Compliance Documentation has a table for Interior Lighting Compliance Test for Additional Lighting which reads Total Additional Interior Lighting Power Allownace (Watt
"Optional" Upload EAp2-1
CI-2009 EAp2:Minimum Energy Performanceposted by Andrew Mitchell, P.E. on
Is it optional to upload all of the compliance forms if you initial the box and qualify for EAc1.3? What if EAc1.3 is not achieved but you have done the model and have some savings shown?