Occupancy Doubt
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Marina Andrade on
Hi everyone, i'm working in a office building that will be certified.
Vacant Space Critical Zones
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Robert Calloway on
I am working on a building that has multiple floors that are completely stripped and wide open for new tenants to design the layout to.
Option B Calculator
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Haley Duncan on
Where can I find the Option B Calculator that is used to calculate compliance with 10 CFM per person for AHU's unable to meet ASHRAE 62.1-2007?
Unable to Meet Pre-req during Current Performance Period
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Kristofer Kiszynski on
I was wondering what would happen if we failed to meet a prerequisite such as IEQp1. Would we need to restart our performance period after correcting whatever it is that needs to be corrected?
Case 2
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by AAME User on
If the 62MZ calculator reveals that the critical zone is a zone with cooling only (with a min of 0), is that an appropriate reason to pursue Case 2?
Which calculator version I have to use
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Patricia Fuertes on
I have downloaded the "USGBC LEED 62MZCalc (May 2011) and I have to complete manually the cells that correspondon to the "Inputs of the system".
Physical constraints
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
Hallo, I am wondering what is the Reference Guide referring to when it says "physical constraints of the existing ventilation system".
Parking and Data center included?
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Ricardo Sobral on
Our project includes one Data Center and a parking space.
Mixed use: Production; Shipping/Receiving; R/D; Office Space
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Aaron Nelson on
The building has four space types and 20 AHUs. The building lacks any integrated controls, so each AHU operates independent of the other.