measuring heat pump load for system submetering
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by ethan adams on
I have about 35 ceiling- mounted heat pumps throughout the building, and it would be cost-prohibitive to install a separate meter on each one.
Interpretation doubt
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Carolina Vergnano on
Hello, I've got a doubt about the time that we should develop the breakdown of energy.
Calibration
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Gustavo De las Heras Izquierdo on
Hallo, According to the BMS and HVAC subcontractor, the sensors do not need to be calibrated, particularly CO sensors and chilled water temperature sensors.
How to define categories
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Noriko Nagazumi on
Hello there, There is a sample summary of energy and metering capacity on page 200 of the reference guide, and some explanation on "Energy Use Breakdown" on page 198 saying that significant appli
What to do?
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Paola Figueiredo on
Our project team is working on LEED EBOM certification of an industrial compound, and there is a question we are not so sure about and we believe one of you may be able to help.
LEED V3 Vs V4
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by VISHESH AGARWAL on
Advanced energy metering: if a project have all end use submeter but no have enery reporting software or BAS.
Gas metering
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Oana Stamatin on
In our office building, the annual Gas Consumption accounts for more than 40% of the total annual energy consumption. The gas is used for Heating and for Cooking (for a Restaurant).
Mixed use meter
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Alicia Villanueva on
We have a meter that measures: chiller + pump + lighting system. Since we are not discriminating by "end use": would this meter qualify towards this credit? Thanks GH
Period & time of Breakdown
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Alexa Stone on
Hi all, I'm confused about when OR over what period of time does the breakdown need to capture. I understand that it needs to roll up to the EAc1 declared annual energy use (mbtu).
EAp2/c1 Metering Requirements Also Earn EAc3.2?
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by American University on
If we had to meter things like hot water usage and chillers on a building level to comply with EAp2/c1 to do building-level metering of all incoming energy inputs, would we automatically be able to