Performance period duration
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Charalampos Giannikopoulos on
The LEED Online form requests that “monthly and annual summaries of the metered energy usage for each of the subsystems”.
Commercial Building with Tenant spaces fully submetered
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Energy Spectrum on
I am wondering if a commercial building, where over 90% of the building is submetered tenant space would qualify for this credit.
Subsystem or End Use Type
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Ran Zhang on
On page 200 of the LEED-EB reference guide, Table 1- Sample Summary of Energy and Metering Capacity lists major energy-consumption subsystems and end-uses.
Occupancy in the building
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Alberto Cardenas on
My question is if the occupancy of the building is a single person in this case of an institution and has no tenants can apply for this credit.
Can gas metering only qualify for EAc3.2?
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by James Doyle on
Under LEED EBOM 2009 I am considering attempting metering under credit EAc3.2 for a 200,000 sq. ft.
measuring heat pump load for system submetering
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by ethan adams on
I have about 35 ceiling- mounted heat pumps throughout the building, and it would be cost-prohibitive to install a separate meter on each one.
Gas metering
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Oana Stamatin on
In our office building, the annual Gas Consumption accounts for more than 40% of the total annual energy consumption. The gas is used for Heating and for Cooking (for a Restaurant).
Mixed use meter
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Alicia Villanueva on
We have a meter that measures: chiller + pump + lighting system. Since we are not discriminating by "end use": would this meter qualify towards this credit? Thanks GH
Period & time of Breakdown
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Alexa Stone on
Hi all, I'm confused about when OR over what period of time does the breakdown need to capture. I understand that it needs to roll up to the EAc1 declared annual energy use (mbtu).
EAp2/c1 Metering Requirements Also Earn EAc3.2?
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by American University on
If we had to meter things like hot water usage and chillers on a building level to comply with EAp2/c1 to do building-level metering of all incoming energy inputs, would we automatically be able to