EBOM-2009 EAc1:Optimize Energy Performanceposted by Leandro Silva on
Dear all,
Good afternoon.
Case 2 Option 2C
EBOM-2009 EAc1:Optimize Energy Performanceposted by Patrick Cellie on
I am working with a convention center that is currently Silver certified under the v2009 EBOM rating system.
Portfolio Manager - All Requests Suspended for Energy Star Scores Until Early 2019
EBOM-2009 EAc1:Optimize Energy Performanceposted by Michelle Bracewell-Musson on
I will assume most are aware that Portfolio Manager has suspended applications for Energy Star Certification from September 2018 until early 2019. As a requirement for EAc1 to be earned,
LEED EBOM EA1 PR2 - Casino Hotels
EBOM-2009 EAc1:Optimize Energy Performanceposted by Aron Weis on
If a 6,000,000 square foot hotel/casino is more than 50% hotel space, are they required to use Option 1 - Portfolio Manager to get an Energy Star rating?
Church+Classrooms = Office?
EBOM-2009 EAc1:Optimize Energy Performanceposted by Charles Shinneman on
I have a church that runs extended house 9am-10pm 6.5 days a week has classrooms that are not heavily occupied. In classifying it the occupancy looks more like an office with extended hours.
On Site Solar Power
EBOM-2009 EAc1:Optimize Energy Performanceposted by Julia Weatherby on
Energy Star Portfolio Manager requires that power produced and used on site be included when submitting for an Energy Star rating.
Maximum Points Available
EBOM-2009 EAc1:Optimize Energy Performanceposted by David Hubka on
The LEED O&M reference guide states that two points are available under EA Credit #1 for projects that follow Case 2 Option 2A however the LEED online template does not award credits under this
Normalizing Baseline
EBOM-2009 EAc1:Optimize Energy Performanceposted by Timothy Casper on
Given our unique project conditions we are pursuing this credit via Case 2, Option 2B.
Protfolio Manager Analysis
EBOM-2009 EAc1:Optimize Energy Performanceposted by Paola Figueiredo, Newton Figueiredo on
We are working on projects for LEED EBO&M and have some doubts related to the credits EApre1& EAc1.