Energy Performance Periode
EBOM-2009 EAc1:Optimize Energy Performanceposted by Leandro Silva on
Dear all,
Good afternoon.
Case 2 Option 2C
EBOM-2009 EAc1:Optimize Energy Performanceposted by Patrick Cellie on
I am working with a convention center that is currently Silver certified under the v2009 EBOM rating system.
Portfolio Manager - All Requests Suspended for Energy Star Scores Until Early 2019
EBOM-2009 EAc1:Optimize Energy Performanceposted by Michelle Bracewell-Musson on
I will assume most are aware that Portfolio Manager has suspended applications for Energy Star Certification from September 2018 until early 2019. As a requirement for EAc1 to be earned,
LEED EBOM EA1 PR2 - Casino Hotels
EBOM-2009 EAc1:Optimize Energy Performanceposted by Aron Weis on
If a 6,000,000 square foot hotel/casino is more than 50% hotel space, are they required to use Option 1 - Portfolio Manager to get an Energy Star rating?
On Site Solar Power
EBOM-2009 EAc1:Optimize Energy Performanceposted by Julia Weatherby on
Energy Star Portfolio Manager requires that power produced and used on site be included when submitting for an Energy Star rating.
Church+Classrooms = Office?
EBOM-2009 EAc1:Optimize Energy Performanceposted by Charles Shinneman on
I have a church that runs extended house 9am-10pm 6.5 days a week has classrooms that are not heavily occupied. In classifying it the occupancy looks more like an office with extended hours.
Maximum Points Available
EBOM-2009 EAc1:Optimize Energy Performanceposted by David Hubka on
The LEED O&M reference guide states that two points are available under EA Credit #1 for projects that follow Case 2 Option 2A however the LEED online template does not award credits under this
Normalizing Baseline
EBOM-2009 EAc1:Optimize Energy Performanceposted by Timothy Casper on
Given our unique project conditions we are pursuing this credit via Case 2, Option 2B.
Protfolio Manager Analysis
EBOM-2009 EAc1:Optimize Energy Performanceposted by Paola Figueiredo, Newton Figueiredo on
We are working on projects for LEED EBO&M and have some doubts related to the credits EApre1& EAc1.