water bills received every 3 months
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Agnieszka Rylska on
Our project receives water bills including water usage every 3 months.
Off-grid Project in Mexico
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Jeremy Kuhre on
We are currently evaluating an off-grid hospitality project in Mexico. The project is primarily powered by a 32kW PV array which is sometimes supplemented by a propane generator.
Facility Summary
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Charalampos Giannikopoulos on
LEED Online requests a copy of the complete Statement of Energy Performance (SEP).When generating the statement, it is noted to make sure to select the following report options: Statement of Energy
1-floor renovation in an 2009 EBOM Certified Building
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by John Krutko on
I am proposing on a project in which the scope is the renovation of a single floor of a 10 story building that is currently LEED 2009 EBOM certified.
LEED Certifying a Building with an EnergyStar label
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Dawn Brenner on
The downton high-rise I am attempting LEED certification has an EnergyStar label that just expired on Mar 31, 2011.
Office Space With 25% Data Center Changing to 100% Office-June
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Michelle Bracewell-Musson on
There are four buildings that are leased by the State and one of the buildings currently has 25% if it as a Data Center.
Increased energy consumption by a single tenant
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Anna Korinkova on
Hi all! How to correctly input energy data (to ES Portfolio Manager) for an office building where a tenant (bank) has it's own chiller, consumes almost one third of the total building energy consum
Include fuel oil usage from emergency generators?
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Jessica Hawley on
On past LEED EBOM Certifications, GBCI has required us to input fuel oil used in our emergency generators. So we did.