EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Erika Roy on
Hello
Case 2 Calculator Space Type
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Kevin Aisawa on
Hello,
Energy Star approach for a campus with shared parking
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by F. Borja López Calle on
Good morning.I am working on a LEED project that was registered under LEED EB: O&M 2009 that classifies as LEED campus as well.
Minimum % Reduction for Historical Data - Case 2?
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Kimberly Frith on
We see there are EAc1 points associated with reducing energy consumption as compared to historical building energy usage data for Case 2 projects that can't earn the Energy Star label, but it's unc
EA P2 data requirement
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by ravi singh on
Can anyone help me regarding the EA C1 performance period. My project is already certified under LEED NC now going for EBOM , then what will be my performance period for EA C1.
Question about the results in Performance Period
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Ron Dean on
There is a possibility that in the 12 months of the Performance Period, during the first six months not obtained satisfactory results provided the measures and strategies to achieve the minimum sco
District Co generation Plantby
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by satheesh M on
Hi, The building is catered by own chiller plant located in the building & building owned DES Cogeneration plant for the space cooling.
International Project - Case 2 Option 1 or Option 2
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Sheena Moses on
Dear all, We have a retail mall in Malaysia targeting LEED EBOM v2009 rating.