EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Kelly Witosky on
We are working on a project that has completed the Preliminary Review Phase of Certification, this is a high-rise office building located in an urban area, with occupancy that fluctuated over the p
Calculator template
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by American University on
Does anyone have an excel template that they created to calculate the baseline vs. installed case? I've been working on it, but it is complicated. Email: curley@american.edu if so. Thanks!
Rainwater Harvesting
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Udana Ratnayake on
Is it possible to show compliance with this prerequisite by reducing potable water use by harvesting and reusing rainwater for flushing?
Authentication of water fixture installation date
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by David Mortensen on
Had anyone successfully used as-built drawings to verify the installation date of water fixtures?
Transient Occupants (specifically students)
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Ashley Chiang on
I understand the different occupancy types and the default fixture use values; however, what I do not understand is how I am suppose to get a somewhat accurate estimation of a occupancy daily total
Good or no?
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Elizabeth Crenshaw Hammitt on
The way I am interpreting this credit, it would seem that is the project was built post 1994, while a baseline can be calculated, there is no chance of not meeting the PR as long as a satisfactory
economic assessment
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Pablo Fortunato Suarez on
What the client has is a project for proposed upgrades since the building is quite old, making upgrades necessary.
WEp1 - Substantial Completion Date
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by susan eguia on
As per WEp1 requirement, the water use baseline is set depending on the year of substantial completion of the building indoor plumbing system.