EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by Varun Chandra on
We have a project with an office tower (white TPO) and a detached 2-story annex (mod-bit BUR). The annex is 7% of the total building area.
Roof cleaning and water
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by Kimberly Hosken on
If LEED reviewers are now rejecting hardscape management plans for using power washing (water), does anyone know if using "water" to clean our roof will be rejected?
Can the existing roof count?
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by Kelly Wieczorek on
If our existing roof meets the requirements can we achieve the credit, or does there have to be a change/upgrade from the existing to comply?
Material SRI
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by Mohamed Hesham on
i'm participating in a LEED ebom project where the construction was completed in 1990 , the roof tiles are white terrazzo tiles but we can't get any data or documentation from the manufacturer , is
Green Roof Installation After PC for C&S
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by Patrice McVeigh on
Hi, I have a Core & Shell Project that will be installing a Green Roof after the Post Construction stage (i.e.
Roof Area definition
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by David Tompos on
The definition for roof area indicates that only the roof area directly above the Gross Square Footage should be used for the Option 1 - 75% calculation.
Partially certifying building
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by h r on
Upper floors of building are utilized as hotel and lower floors are utilized as office. Owners are diffrent. Only the office is going to certified under LEED EB except hotel.