Forum quick links
Definition of "Outdoor Air"
NC-2009 IEQp1:Minimum indoor air quality performanceposted by James Chueh on
We are seeking LEED NC certification in a high-tech manufacturing plant, and it is a normally practice to only use natural ventilation (louvers and openings to outside of the building) for spaces s
EQ p1 -Minimum IAQ Performance (Natural Ventilation)
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Harsharan Kaur on
Hello, We are working on a Project, in which most of the rooms are complying with the ASHRAE 62.1-2007 Natural Ventilation requirements, stated under the IEQ Prerequisite 1 – Minimum Indoor Air Qu
IEQp1 required signatory
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Anne-Maria Vierinen on
Our HVAC designer is also the ventilation systems designer on our project.
Does mech engineer need to be PE to sign the "signature' box ?
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Matt Dem on
Shall the person who enters his/her initials under signatory section ( for example IEQp1 or EAp2-1, 2-2, 2-3 ) be registered mechanical engineer (PE) ?
IEQp1
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Gordon Nielson on
I am having troubles understanding what is a single zone system and a multiple-zone system and how to fill out the forms.
Local Code more stringent than Ashrae 62.1
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Gaston Viau on
Our project has to achieve CA Title 24 which is more stringent than Ashrae 62.1.
VRP in the space matrix
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
Hallo, What does VRP stand for in the column IEQp1 of the space matrix?
Elevator Machine Room/ Electrical Room Ventilation?
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Xun Jia on
Does elevator machine room or electrical room need to comply with ASHRAE 62 for Ventilation?
Which version of LEED forms to use.
NC-2009 IEQp1:Minimum indoor air quality performanceposted by VEL MUTHU on
We are working on a project which was registered under V3 on 2015 and still running. My doubt is the the online form is updated from version to version.