Post a question or comment
Credit Filters
Recycled Content
Filter by location
Forum
Topic
Replies
Recent

Assemblies

NC-2009 MRc4:Recycled Content
posted by  David Brown  on 

In idiot terms could someone please tell me what makes up an "assembly". I am a glazing contractor working on a LEED project. I have two items needing LEED submittals for the MR4 credit.

6
Assistant Site Superintendent
QBS, Inc.
LEEDuser Basic Member
3 thumbs up
Thu Aug 18, 2016, 2:16 am

Recycled content in road underlay material

NC-2009 MRc4:Recycled Content
posted by  Agnieszka Rylska  on 

In our project coal slate which is a waste from a coal mine will be used to create the underlay for the roads and the building. Can this be included in recycled content calculations?

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Aug 1, 2016, 10:29 am

Recycled Content Percentages

NC-2009 MRc4:Recycled Content
posted by  Jace Christensen  on 

I am calculating the percentage of materials that contain recycled content. It says MEP type work is not to be included in the calculation.

5
Building Enclosure Consultant
BPL Enclosure
LEEDuser Basic Member
58 thumbs up
Thu May 19, 2016, 1:37 am

Definition of Assembly

NC-2009 MRc4:Recycled Content
posted by  Martin Meehan  on 

LEED language seems a bit loose about what must be considered assembly. I see from previous comments from Jon Clifford that assembly is what is delivered to site "assembled", which makes a lot of

5
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu May 12, 2016, 8:10 am

3 LEED projects sitting on a parking & retail layer cake

NC-2009 MRc4:Recycled Content
posted by  Susan Di Giulio  on 

Hi, We have a campus master site occupying a city block. There are 7 podium floors with a hotel, condo towers and retail sprouting from them that are parsed into 3 separate LEED projects.

6
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Apr 21, 2016, 5:50 pm

Items that are used for either MRc4 or MRc3

NC-2009 MRc4:Recycled Content
posted by  Erika Duran  on 

Dear All, I am unclear about something. If I have items that would qualify for MRc3 but we are not pursuing that credit, is it acceptable to count them towards MRc4?

5
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Mar 14, 2016, 6:37 pm

Fire Extinguisher & Cabinet (MRc4 & MRc5)

NC-2009 MRc4:Recycled Content
posted by  Elliot Young  on 

Hi, we just received a submittal for fire extinguishers and recessed fire extinguisher cabinets - claiming to have recycled content and regional materials.

2
Associate
NK Architects
LEEDuser Basic Member
11 thumbs up
Fri Feb 5, 2016, 1:47 am

Planting recycled conent

NC-2009 MRc4:Recycled Content
posted by  Thomas Perkins  on 

“Site materials (31.60.00 Foundations, 32.10.00 Paving, 32.30.00 Site Improvements, and 32.90.00 Planting) that are permanently installed can be included in the MR credits.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Wed Jan 27, 2016, 12:04 am

Anchor Bolt Recycle Content

NC-2009 MRc4:Recycled Content
posted by  Sarfaraj Khan  on 

Hi I have a anchor bolt material and the supplier is saying that the steel is the world most recycle material.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Thu Dec 10, 2015, 3:25 pm

Seismic isolation system

NC-2009 MRc4:Recycled Content
posted by  Noriko Nagazumi  on 

Hi, Our project includes seismic isolation system, because the project building is located in earthquake prone country.

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Sep 10, 2015, 5:40 am