Calculation of replacement cost
NC-2009 MRc3:Materials Reuseposted by Adrienn Gelesz on
Hi, When there is some material that was donated, that actually does not appear in the total material cost (no money actually spent).
How can I calculate Materials and Resources by Default materials cost
NC-2009 MRc3:Materials Reuseposted by mohamed nur hashi on
I am a student and I am working on leed material calculation.
MRc3 and reused furniture
NC-2009 MRc3:Materials Reuseposted by Jeff Wiedmeyer on
My client wants to know what credits might be applicable to the re-use of furniture from another one of its projects for use in the current project. I told the client that I believe the only
Reusing existing concrete slabs
NC-2009 MRc3:Materials Reuseposted by Laura Rebbe on
We are maintaining an existing aircraft hangar floor slab and an adjacent concrete apron for reuse as an equipment parking area.
Receipt Proof Requirements
NC-2009 MRc3:Materials Reuseposted by jupiter luner on
I wanted to clarify something that I recently heard from a contractor on a LEED project.
Material reuse based on cost or volume
NC-2009 MRc3:Materials Reuseposted by Mahbuba Khan AIA, LEED AP BD+C on
I am working on an international LEED NC 2009 project.
Salvaged Materials Code Conflict
NC-2009 MRc3:Materials Reuseposted by Annalise Reichert on
I am working on a 17-story multi-family new construction project in California that will not involve any demo of existing structures at the site.
Is soil a material considered on this credit?
NC-2009 MRc3:Materials Reuseposted by Albert Sagrera on
Would you consider the reuse of soil on this credit? The situacion is that the soil extracted for the building construction is not send to dump but it's reused on the modeling of landscape.
Documenting costs and cut sheets
NC-2009 MRc3:Materials Reuseposted by John Covello on
Hello, Our project will be purchasing old teak wood (in good shape) from housing that is to be demolished. The invoices may be simple hand written pages noting the pricing and date.
Material Reuse on Other Buildings within Site Boundary
NC-2009 MRc3:Materials Reuseposted by Josh Sawyer on
We are working on project that has four buildings connected together on the site.