Calculation of replacement cost

NC-2009 MRc3:Materials Reuse
posted by  Adrienn Gelesz  on 

Hi, When there is some material that was donated, that actually does not appear in the total material cost (no money actually spent).

4
LEED Fellow, Senior Program Manager for Global Energy & Sustainability
CBRE
LEEDuser Expert
102 thumbs up
Thu Nov 12, 2020, 8:42 pm

How can I calculate Materials and Resources by Default materials cost

NC-2009 MRc3:Materials Reuse
posted by  mohamed nur hashi  on 

I am a student and I am working on leed material calculation.

0

MRc3 and reused furniture

NC-2009 MRc3:Materials Reuse
posted by  Jeff Wiedmeyer  on 

My client wants to know what credits might be applicable to the re-use of furniture from another one of its projects for use in the current project.  I told the client that I believe the only

5
LEED Fellow, Senior Program Manager for Global Energy & Sustainability
CBRE
LEEDuser Expert
102 thumbs up
Fri Jan 24, 2020, 10:39 pm

Reusing existing concrete slabs

NC-2009 MRc3:Materials Reuse
posted by  Laura Rebbe  on 

We are maintaining an existing aircraft hangar floor slab and an adjacent concrete apron for reuse as an equipment parking area.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Sep 14, 2018, 5:38 pm

Receipt Proof Requirements

NC-2009 MRc3:Materials Reuse
posted by  jupiter luner  on 

I wanted to clarify something that I recently heard from a contractor on a LEED project. 

 

1
Tue Jan 31, 2023, 2:20 pm

Material reuse

NC-2009 MRc3:Materials Reuse
posted by  Ameet AA  on 

If the materials are to be reused, ship from another country would it assist for attaining any LEED Credits? As i understand it would not be sustainable in terms of carbon emission.

1
Fri Apr 6, 2012, 6:56 pm

Dismantling of building

NC-2009 MRc3:Materials Reuse
posted by  Tanja Arnesson  on 

Hi, We have a site were four different buildings will be conducted. Within the contract from the municipality demolition of two buildings should be carried out before the new construction.

1
Thu Feb 7, 2013, 7:04 pm

Re-using shale and theater seating

NC-2009 MRc3:Materials Reuse
posted by  Michelle Meis  on 

I am on a project that is installing geothermal. The company that will be drilling the wells is planing on re-using the shale that is removed during the process.

1
Fri Oct 4, 2013, 1:21 am

Buried crushed concrete

NC-2009 MRc3:Materials Reuse
posted by  Maria Isabel Conde  on 

We are demolishing an existing building. The team is considering burying the concrete, without this being used as fill for the new building. Could this account for the MRC2? Thanks,

1
Thu Jun 19, 2014, 9:02 pm

Trees on site to be used for furniture, blocking and/or veneer.

NC-2009 MRc3:Materials Reuse
posted by  Seonhee Kim  on 

If some of trees on site need to be cleared and we decide to use it for furniture, blocking and/or veneer, does this count as MRc3?

1
Wed Mar 20, 2013, 11:15 pm