Measurement & Verification and PI Form 1
NC-2009 EAc5:Measurement and Verificationposted by Ivan Romero on
I'm still not completely clear on the reporting commitment for energy and water usage data.
Alternative Compliance for M&V
NC-2009 EAc5:Measurement and Verificationposted by Deborah Lucking on
All, our project is a large and complex convention center remodel/expansion. We are proposing a metering strategy that is tailored to the way the building will be operated.
Broken Link
NC-2009 EAc5:Measurement and Verificationposted by Cynthia Estrada on
Hi Marcus, I was looking for an example M&V Plan and found that the link to EVO example is broken.
Base Model using Option D
NC-2009 EAc5:Measurement and Verificationposted by Kalyan Nishtala on
This is the first time I am dealing with this credit. I am confused with what the base mode (using option D) entails.
calibration parameters
NC-2009 EAc5:Measurement and Verificationposted by Edward Niemczycki on
We have nearly completed a LEED Silver project and they are still asking for simulation calibration procedures, calibration parameters, frequency of measurement and calibration accuracy for the EAc
EAc5 Option 3
NC-2009 EAc5:Measurement and Verificationposted by Sheryl Swartzle on
Our client chose Option 2 on the PIf1 and the form has been approved. They have decided to pursue the 1 point available in EAc5 for choosing Option 1 in PIf1.
Final M&V Report
NC-2009 EAc5:Measurement and Verificationposted by Valerie Walsh on
We would like to know if the project can obtain its LEED certification prior to submitting the Final M&V Report, which is dependent upon 1 year of post-occupancy energy use data.
LEED NC 2009 EAc5 Measurement and Verification
NC-2009 EAc5:Measurement and Verificationposted by Zeb Foss on
I am currently training and researching in order to become involved in the M&V process for various new construction buildings within the near future.
DES and EAc5
NC-2009 EAc5:Measurement and Verificationposted by FABIO VIERO on
Hi, I'm now working on a project under LEED certification, according to NC v2009. This project is served by a DES: it is more than 50.000 sqf of GFA, in which the DES supplies energy for more than
Exception to DES
NC-2009 EAc5:Measurement and Verificationposted by FABIO VIERO on
Hi, I'm now working on a group project certification based on three buildings. The HVAC System has a central cooling system that serves only the three buildings. The central cooling system is l