LPG Gas Connection and Usage in the LEED certified building .
NC-2009 EAc3:Enhanced commissioningposted by Selvam C on
Dear Team,
Greeting to everyone,
Enhanced Commissioning and Measurement and Verification
NC-2009 EAc3:Enhanced commissioningposted by Saju Varghese on
Hello, It been a little hard to draw the line between the enhanced commissioning scope and the measurement and verification scope.
D & C Team perform Commissioning, CxA only Verifies?
NC-2009 EAc3:Enhanced commissioningposted by Adrian Arenas on
Our project is pursuing Enhanced Cx credit v2009.
Mid construction Review
NC-2009 EAc3:Enhanced commissioningposted by Omar Elrawy on
I've received a reviewer's feedback stating that "the required back-check Design review occurred after the date for beginning of construction...Provide a narrative explaining the sequence
Enhanced Commissioning in District energy Systems (DES) with Combined Heat and Power (CHP) plant
NC-2009 EAc3:Enhanced commissioningposted by Ricardo Sá on
We are certifying a project that is being developed in a site that comprises a District Energy System based on a Combined Heating and Power Plant (DES-CHP).
Appointment of CxA for Enhanced Commissioning
NC-2009 EAc3:Enhanced commissioningposted by kerry wang on
My project is about to complete the Design Development stage and CxA is to be on-board soon.
When is the building considered occupied?
NC-2009 EAc3:Enhanced commissioningposted by Lise Dannesboe on
Hi. For the 10 month post-occupancy commissioning - when is the post-occupancy considered started. When all occupants (100%) have moved into the house and all equipment is up and running?
UPS system need to be commissioned?
NC-2009 EAc3:Enhanced commissioningposted by Eric JS on
Hi all, UPS system is used as a back up power in case if there is power failure. In that case. UPS itself consume small amount of power.
Enhance Cx, 10 month review of building operation
NC-2009 EAc3:Enhanced commissioningposted by Laura Howe on
Can anyone provide some guidance or examples of what is recommended for the building operation review within 10 months of substantial completion?