Activity Generated Electricity from a Manufacturing process

NC-2009 EAc2:On-Site Renewable Energy
posted by  Kendal Neitzke  on 

Our porject is a manufacturing facility that produces generators and converters for wind turbines. A component of the manufacturing process is the balancing of the generator rotors.

1
Fri Feb 11, 2011, 7:22 pm

Splitting credit for renewable energy to 2 different buildings?

NC-2009 EAc2:On-Site Renewable Energy
posted by  Renee Shirey  on 

We have a few schools from the same district being built at the same time, and we are considering adding PV to some/all of them.

1
Fri Aug 31, 2012, 1:46 pm

Pellets

NC-2009 EAc2:On-Site Renewable Energy
posted by  Emmanuel Pauwels  on 

Would pellets made of mill residue be considered as renewable for this credit considering the fabrication process of pellets involves a chemical and/or physical treatment?

1
Tue May 27, 2014, 3:40 pm

Projected Biomass Boiler

NC-2009 EAc2:On-Site Renewable Energy
posted by  Jose Salinas  on 

Hi, a company will be working with provisional natural gas boilers, but in a year's time two boilers will be replaced by a biomass boiler whish will be working on sawdust.

1
Fri Aug 26, 2011, 3:25 am

Clarification on Solar Hot Water system eligibility

NC-2009 EAc2:On-Site Renewable Energy
posted by  Sasha Peters  on 

Please confirm if solar hot water system is eligible for EA credit 2 - On-Site Renewable Energy compliance considering that it is only used for water heating and not generating energy directly.

1
Mon Apr 20, 2015, 3:17 pm

EA Credit 2

NC-2009 EAc2:On-Site Renewable Energy
posted by  Cristina Parenti  on 

Hello, we are working on a project that intended to install solar panels on the roof but there isn't much room left for them..

1
Fri May 26, 2017, 2:53 pm

Owner Agent required information

NC-2009 EAc2:On-Site Renewable Energy
posted by  Francisco Villela  on 

Marcus, I am looking at the on-line form for EAc2 On-Site Renewable Energy. (LEED 2009 for New Construction) The asterisk occurs after each of two Required Signatory boxes.

1
Tue Nov 29, 2011, 4:56 pm

PV's special rate

NC-2009 EAc2:On-Site Renewable Energy
posted by  FABIO VIERO  on 

Hello all, As I understand, all the energy produced by photovoltaic panels which is not used for the building (then fed into the grid) can not be counted for the purposes of credit EAC2.

1
Wed May 22, 2013, 12:59 pm

Probability distribution of annual PV production.

NC-2009 EAc2:On-Site Renewable Energy
posted by  Indochine Engineering VN  on 

Hi, a solar PV consultant gave me an output of their simulation, in which show probability distribution diagram of Solar PV production.

1
Tue Nov 17, 2015, 2:23 pm