Activity Generated Electricity from a Manufacturing process
NC-2009 EAc2:On-Site Renewable Energyposted by Kendal Neitzke on
Our porject is a manufacturing facility that produces generators and converters for wind turbines. A component of the manufacturing process is the balancing of the generator rotors.
Splitting credit for renewable energy to 2 different buildings?
NC-2009 EAc2:On-Site Renewable Energyposted by Renee Shirey on
We have a few schools from the same district being built at the same time, and we are considering adding PV to some/all of them.
Pellets
NC-2009 EAc2:On-Site Renewable Energyposted by Emmanuel Pauwels on
Would pellets made of mill residue be considered as renewable for this credit considering the fabrication process of pellets involves a chemical and/or physical treatment?
Projected Biomass Boiler
NC-2009 EAc2:On-Site Renewable Energyposted by Jose Salinas on
Hi, a company will be working with provisional natural gas boilers, but in a year's time two boilers will be replaced by a biomass boiler whish will be working on sawdust.
Clarification on Solar Hot Water system eligibility
NC-2009 EAc2:On-Site Renewable Energyposted by Sasha Peters on
Please confirm if solar hot water system is eligible for EA credit 2 - On-Site Renewable Energy compliance considering that it is only used for water heating and not generating energy directly.
EA Credit 2
NC-2009 EAc2:On-Site Renewable Energyposted by Cristina Parenti on
Hello, we are working on a project that intended to install solar panels on the roof but there isn't much room left for them..
Owner Agent required information
NC-2009 EAc2:On-Site Renewable Energyposted by Francisco Villela on
Marcus, I am looking at the on-line form for EAc2 On-Site Renewable Energy. (LEED 2009 for New Construction) The asterisk occurs after each of two Required Signatory boxes.
PV's special rate
NC-2009 EAc2:On-Site Renewable Energyposted by FABIO VIERO on
Hello all, As I understand, all the energy produced by photovoltaic panels which is not used for the building (then fed into the grid) can not be counted for the purposes of credit EAC2.
Probability distribution of annual PV production.
NC-2009 EAc2:On-Site Renewable Energyposted by Indochine Engineering VN on
Hi, a solar PV consultant gave me an output of their simulation, in which show probability distribution diagram of Solar PV production.