Mon Jun 14, 2010, 5:48 pm

Transpired Solar Collector

NC-2009 EAc2:On-Site Renewable Energy
posted by  Tyler Barter  on 

For an upcoming project we are proposing using a metal wall system that acts as a transpired solar collector to bring preheated air into the building.

1
Tue Apr 17, 2012, 2:33 pm

Biomass Qualifications

NC-2009 EAc2:On-Site Renewable Energy
posted by  Anthony Schoen  on 

We are currently starting a project that utilizes a biomass central steam plant. This plant uses wood chips, a waste product from local paper factories.

1
Wed Jul 10, 2013, 1:30 pm

Commissioning of PV system by different commissioning agent

NC-2009 EAc2:On-Site Renewable Energy
posted by  Deborah Lucking  on 

We have had this question come up a few times - the owner and the PV system supplier believe that it can be commissioned by a different commissioning agent.

1
Mon May 1, 2017, 1:06 pm

Eligibility of Wood

NC-2009 EAc2:On-Site Renewable Energy
posted by  Jens Apel  on 

This is a more general question about the eligibility of wood as renewable fuel. Following the Reference Guide I get the impression that all wood apart from untreated waste and mill residue is inel

1
Sat Apr 23, 2011, 5:28 pm

Jute Boiler

NC-2009 EAc2:On-Site Renewable Energy
posted by  SAMY Chamy  on 

Dear All:- In our project we have Jute boiler in our project with 2.0 Ton capacity This boiler utilizes the Jute scrap but the scrap is collect fro nearest jute making stations As per ID-10300

1
Fri Jun 24, 2016, 2:45 pm
0

PVs added after design submission

NC-2009 EAc2:On-Site Renewable Energy
posted by  Aliesa Adelman  on 

If an energy model has been reviewed during design phase submission and PVs are added during construction but were not included in the model, can the model be rerun and resubmitted during the const

1
Mon Sep 19, 2011, 9:02 pm

EAc2 criteria of the biogas

NC-2009 EAc2:On-Site Renewable Energy
posted by  Marcello Polverino  on 

Hello, I need the criteria of biogas outside of United States (Germany). Are ther requirements? Thank you > Marcello

1
Wed Mar 13, 2013, 1:36 pm

Hello, regarding my previous

NC-2009 EAc2:On-Site Renewable Energy
posted by  Gabriele Polenta  on 

Hello, regarding my previous post I have one more doubt: having the building with a biomass system, in EAc1 when calculating the thermal energy do I have to use the local gas cost or the local biom