E-85 at a gas station?

NC-2009 EAc2:On-site renewable energy
posted by  April Ambrose  on 

We are doing LEED Volume under NC-Retail for a gas station chain that sells E-85 at all locations. Does E-85 qualify as On-Site Renewable Energy?

1
Mon Jan 16, 2012, 3:29 pm

Direct grid feed in - eligible?

NC-2009 EAc2:On-site renewable energy
posted by  Jens Apel  on 

After reading all threads and LI I am still unsure if PV production directly fed into the grid is eligible for EAc2. Consider a PV array owned and operated by the building / LEED project owner whic

1
Tue May 28, 2013, 2:46 pm

Pellets

NC-2009 EAc2:On-site renewable energy
posted by  Emmanuel Pauwels  on 

Would pellets made of mill residue be considered as renewable for this credit considering the fabrication process of pellets involves a chemical and/or physical treatment?

1
Tue May 27, 2014, 3:40 pm

Activity Generated Electricity from a Manufacturing process

NC-2009 EAc2:On-site renewable energy
posted by  Kendal Neitzke  on 

Our porject is a manufacturing facility that produces generators and converters for wind turbines. A component of the manufacturing process is the balancing of the generator rotors.

1
Fri Feb 11, 2011, 7:22 pm

Splitting credit for renewable energy to 2 different buildings?

NC-2009 EAc2:On-site renewable energy
posted by  Renee Shirey  on 

We have a few schools from the same district being built at the same time, and we are considering adding PV to some/all of them.

1
Fri Aug 31, 2012, 1:46 pm

Clarification on Solar Hot Water system eligibility

NC-2009 EAc2:On-site renewable energy
posted by  Sasha Peters  on 

Please confirm if solar hot water system is eligible for EA credit 2 - On-Site Renewable Energy compliance considering that it is only used for water heating and not generating energy directly.

1
Mon Apr 20, 2015, 3:17 pm

EA Credit 2

NC-2009 EAc2:On-site renewable energy
posted by  Cristina Parenti  on 

Hello, we are working on a project that intended to install solar panels on the roof but there isn't much room left for them..

1
Fri May 26, 2017, 2:53 pm

Projected Biomass Boiler

NC-2009 EAc2:On-site renewable energy
posted by  Jose Salinas  on 

Hi, a company will be working with provisional natural gas boilers, but in a year's time two boilers will be replaced by a biomass boiler whish will be working on sawdust.

1