Onsite renewable energy- Energy cost offset
NC-2009 EAc2:On-Site Renewable Energyposted by Manikandan S on
Hi All
Timing outsourced solar plan on-site / the building
NC-2009 EAc2:On-Site Renewable Energyposted by Janine van den Kerkhof on
Hi All,
Applicable for On-Site Renewable credit?
NC-2009 EAc2:On-Site Renewable Energyposted by Jeff H. on
My company is considering a geothermal system for an industrial facility.
EAC2 in a Positive Energy Building
NC-2009 EAc2:On-Site Renewable Energyposted by Milena Rafols Salvador on
We are certifying a Positive Energy Building, that will produce 130% of its energy consumption with solar PV. All the energy produced with the PV will be sold to the grid.
Renewable energy fraction; with or without process energy?
NC-2009 EAc2:On-Site Renewable Energyposted by Roberto Oshiro Gama on
Hi, I have a question about the renewable energy fraction. For a industry, the renewable energy fraction must be considered as a fraction of total energy demand or as a fraction of tolal energy wit
Solar PV System Degradation
NC-2009 EAc2:On-Site Renewable Energyposted by Katherine Ann Resurreccion on
Our Solar PV system supplier provided us a calculation of how much solar energy is generated per annum. It is projected that there will be a solar degradation factor of 1% each year.
Can Low missission gas generator qualify for EAc2?
NC-2009 EAc2:On-Site Renewable Energyposted by Mahbuba Khan AIA, LEED AP BD+C on
I am doing a factory building in Dhaka Bangladesh. To offset the power outage, they are going to use gas generator.
Building Type
NC-2009 EAc2:On-Site Renewable Energyposted by Geraldine Assmus on
I'm trying to certify a Retail Store under LEED ID-Retail 2009 in Buenos Aires, Argentina. There is no info in Leed User for this credit.
Transpired Solar Collector
NC-2009 EAc2:On-Site Renewable Energyposted by Tyler Barter on
For an upcoming project we are proposing using a metal wall system that acts as a transpired solar collector to bring preheated air into the building.
Biomass Qualifications
NC-2009 EAc2:On-Site Renewable Energyposted by Anthony Schoen on
We are currently starting a project that utilizes a biomass central steam plant. This plant uses wood chips, a waste product from local paper factories.