Forum quick links
Onsite renewable energy- Energy cost offset
NC-2009 EAc2:On-site renewable energyposted by Manikandan S on
Hi All
Timing outsourced solar plan on-site / the building
NC-2009 EAc2:On-site renewable energyposted by Janine van den Kerkhof on
Hi All,
E-85 at a gas station?
NC-2009 EAc2:On-site renewable energyposted by April Ambrose on
We are doing LEED Volume under NC-Retail for a gas station chain that sells E-85 at all locations. Does E-85 qualify as On-Site Renewable Energy?
Direct grid feed in - eligible?
NC-2009 EAc2:On-site renewable energyposted by Jens Apel on
After reading all threads and LI I am still unsure if PV production directly fed into the grid is eligible for EAc2. Consider a PV array owned and operated by the building / LEED project owner whic
Pellets
NC-2009 EAc2:On-site renewable energyposted by Emmanuel Pauwels on
Would pellets made of mill residue be considered as renewable for this credit considering the fabrication process of pellets involves a chemical and/or physical treatment?
Activity Generated Electricity from a Manufacturing process
NC-2009 EAc2:On-site renewable energyposted by Kendal Neitzke on
Our porject is a manufacturing facility that produces generators and converters for wind turbines. A component of the manufacturing process is the balancing of the generator rotors.
Splitting credit for renewable energy to 2 different buildings?
NC-2009 EAc2:On-site renewable energyposted by Renee Shirey on
We have a few schools from the same district being built at the same time, and we are considering adding PV to some/all of them.
Clarification on Solar Hot Water system eligibility
NC-2009 EAc2:On-site renewable energyposted by Sasha Peters on
Please confirm if solar hot water system is eligible for EA credit 2 - On-Site Renewable Energy compliance considering that it is only used for water heating and not generating energy directly.
EA Credit 2
NC-2009 EAc2:On-site renewable energyposted by Cristina Parenti on
Hello, we are working on a project that intended to install solar panels on the roof but there isn't much room left for them..
Projected Biomass Boiler
NC-2009 EAc2:On-site renewable energyposted by Jose Salinas on
Hi, a company will be working with provisional natural gas boilers, but in a year's time two boilers will be replaced by a biomass boiler whish will be working on sawdust.