Forum quick links
Slab-on-grade Vs Slab-below-grade
NC-2009 EAc1:Optimize Energy Performanceposted by Anna Korinkova on
We have an office building project with garages going 4 storeys underground. The building foundation slab is about 16m deep.
How to use Title 24 2016 to comply with LEED 2009 EAc1
NC-2009 EAc1:Optimize Energy Performanceposted by Bo Yi on
Hi,
I am doing a LEED 2009 project. The project is in California and complied with Title 24 2016. I am trying to use title 24 to comply the LEED EAc 1. I have two questions.
Adiabatic Humidification
NC-2009 EAc1:Optimize Energy Performanceposted by Mike oliva on
I'm trying to wrap my head around modeling an adiabatic humidification system for our project that I can't directly model within TRACE that I know of. I'm planning to model the humidification
Renewables off-site
NC-2009 EAc1:Optimize Energy Performanceposted by Ricardo Sá on
Hi,
we are working in a project pursuing LEED certification (NC v2009).
LEED Energy Modeling - Credits EAp2 and EAc1
NC-2009 EAc1:Optimize Energy Performanceposted by Andrew Buck on
We are working on a Hotel project in Chicago, Illinois (USA) with LEED NC v2009. Is my understanding correct in that for credit EAp2 you can follow LEED v.4, and for EAc1 you can follow
Baseline Exterior Lighting Power Allowance
NC-2009 EAc1:Optimize Energy Performanceposted by Cory Duggin on
USGBC Addenda 100001062 updated the exterior lighting table for LEED v3 projects to the 90.1-2010 allowances. The addenda just says it updates credit SSc8 though.
Thermal energy storage for district cooling
NC-2009 EAc1:Optimize Energy Performanceposted by Nuttanee Vongveeranonchai on
I am modelling a project receiving chilled water from the district cooling plant with an ice storage and wondering how to account for energy use shifting in the building model if I use Option 2 Ful
Service water heating for process water usage
NC-2009 EAc1:Optimize Energy Performanceposted by Kris Phillips on
I have a commercial kitchen facility that has a number of plumbing fixtures used for pot filling, etc, which are considered process water (and is reflected as such in the Water Use Reduction c
Baseline Economizser Requirement for Data Center Rooms
NC-2009 EAc1:Optimize Energy Performanceposted by Hirak Patel on
Hi, I am modeling Airport Traffic Control Tower project for LEED 2009 and I have question regarding economizer requirement. We have data center rooms which are served by CRAC units.
guestrooms keycard: power adjustment for automatic lighting ctrl
NC-2009 EAc1:Optimize Energy Performanceposted by Habitech Distretto Tecnologico Trentino on
This project is a hotel: guestrooms are provided with keycards, so when guestrooms are not occupied all lighting fixtures are automatically shut-off.