Hi, Please help us in solving the Errors in the Minimum Energy Performance Calculator. Project Registered under => LEED NC BD+C -v3 (2009) • Macros are not getting enabled • Shading & Fenes
Energy Recovery Bypass
NC-2009 EAp2:Minimum Energy Performanceposted by Kalyan Nishtala on
Hi, I am working on a building which includes DOAS units with energy recovery cores on the proposed systems. The baseline systems do not require energy recovery per ASHRAE 90.1-2007.
Fan Power and Fan Power Adjustment (FPA)
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, In the project we are modeling, the following issues are still not quite clear for us and we'd appreciate any advice on the matter. Baseline system is 8.
NFRC Rated Fenestration
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
For the proposed model, can we refer to table A8.2 for U-factor of the window but refer SHGC and VLT to the manufacturing data (tested based with NFRC standard)?
CHP - Approach
NC-2009 EAp2:Minimum Energy Performanceposted by Victoria Watson on
Hi, I have a project with a CHP and I am unsure how to model in line with requirements. It is to be constructed as part of the current project and will be in the LEED boundary.
Combination of New Build and Existing
NC-2009 EAp2:Minimum Energy Performanceposted by Jordan Kirrane on
Hello, I am working on the major renovation of an existing office building and new construction of a new entrance/reception atrium.
Decorative Exterior Lighting
NC-2009 EAp2:Minimum Energy Performanceposted by Saif Abdulameer on
Hi everyone, I am working on a project that has exterior decorative lights such as tree lights, small umbrella lights etc.
LEED 2009 DES Projects - Rule Change - August 2016
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Edwards on
I'm working on a project on a collegiate campus that utilizes district chilled water and steam, and I have run into what appears to be a rule change that was snuck into the v2009 Minimum Energy Per
Unmet hours in process areas
NC-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
Hello, The project is Pharmaceutical Manufacturing facility, where a set of parameters such as Temperature, Humidity &Pressure are to be controlled accurately.
Demand Control Ventilation
NC-2009 EAp2:Minimum Energy Performanceposted by Victoria Watson on
Hi, I am wondering what savings can be taken by using room occupancy controls to control the HVAC system in a 24/7 building.