Minimum Energy Performance Calculator – Performance Outputs tab
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings,
In the project we are modeling, there are On-site renewable energy production.
Selecting the HVAC system
NC-2009 EAp2:Minimum Energy Performanceposted by Madushan Samarakoon on
Hi there,
I am working in a LEED project of a 12-story (2 are below ground car parks) City Hotel project with approx. 12000 sqft per floor.
Building Area Method and System designation
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
Hello everyone, I have a project with the following conditioned area categorization.
1st to 5h Floor are composed by:
Building Area Method and System designation
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
Hello everyone, I have a project with the following conditioned area categorization.
1st to 5h Floor are composed by:
Building Area Method and System designation
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
Hello everyone, I have a project with the following conditioned area categorization.
1st to 5h Floor are composed by:
AAMA ratings for U-Value vs. NFRC ratings
NC-2009 EAp2:Minimum Energy Performanceposted by Douglas Flandro on
Our rep has given us AAMA ratings to determine the U-Value of the curtain wall assemblies. LEED seems to be asking for NFRC ratings. Do we need to insist on the NFRC ratings?
Natural ventilation – modeling in Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings,
The project that we are modeling has zones with natural ventilation LEED v2009).
Envelop Exterior /Interior Walls
NC-2009 EAp2:Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on
Hello everyone,