Forum quick links
Air economizers in proposed and baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Jeff Riggs on
If air economizers are not required to be modeled in the baseline system due to climate zone (4a) can you model the proposed with economizers if in design and not model economizers in the baseline?
Campus Condenser Water System
NC-2009 EAp2:Minimum Energy Performanceposted by Weldon McCulloch on
Our project is an office/retail building that is to utilize water source heat pumps for retail and water cooled self contained VAV units for the office floors.
Can I defer any ID credit to submit it w/ construction package ?
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
Thermal blocks for multifamily residential building
NC-2009 EAp2:Minimum Energy Performanceposted by Emma Eliasson on
I have a question about thermal blocks in multy family residential buildings. I'm working with a building that has 4 floors and totly 7 appartments.
Baseline system for water loop heat pump in Proposed case
NC-2009 EAp2:Minimum Energy Performanceposted by Mayank Bhatnagar on
Hello everyone, I am working on a residential project. The proposed case HVAC system is Water loop heat pump with cooling tower and natural gas based condensing boilers.
Process energy
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
For the purpose of energy modelling of an industrial building, there are rooms which have process related humidity control (humidity control which is not intended for comfort).
LEED V4 Section 1.4 Tables
NC-2009 EAp2:Minimum Energy Performanceposted by Chilufya Lombe on
Hi, not sure if I am missing something but the USGBC website's 'Resources' section does not have an updated section 1.4 table for LEED v4.
Energy model OA report
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
If a zone has a large exhaust fan which the exhaust rate is greater than the OA intake at the AHU (the rest of OA will be transferred from other zones , make up air, or infiltration).
Baseline ODA requirement for +30% Vent
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
This question came up and I want to refresh my memory. The baseline model must ALWAYS (baring DV) have the same ODA as the Proposed Design...also when the Proposed Design is applying for the increa
Baseline Pumping Power
NC-2009 EAp2:Minimum Energy Performanceposted by Ahmed Labeeb on
Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head.