90.1 Envelope Requirements
NC-2009 EAp2:Minimum energy performanceposted by Ruben Porter on
I'm trying to model a wood framed 4 story multifamily building, and the client wants to go without continuous insulation which is what's called for on table 5.5-4, resulting in a higher U value th
Water Heater efficiency per table 7.8 of ASHRAE 90.1-2007
NC-2009 EAp2:Minimum energy performanceposted by Billy Condor on
Hello, As required by 7.4.2 Equipment Efficiency of ASHRAE 90.1-2007, for a water heater less than 12 kW and more that 20 gal, the required performance is EF=0.97-0.00132*V. My question is: is ther
is this clarification ok?
NC-2009 EAp2:Minimum energy performanceposted by Shenhao Li on
automatic daylighting controls and occupancy sensor are adapted into the project, and many other energy saving measures included,i do not simulate daylighting control and occupancy sensor in the en
District Thermal Energy and Single LEED project boundary
NC-2009 EAp2:Minimum energy performanceposted by MARCIO OROFINO on
The project comprises four hospital buildings, called B, C, D and E, and each building is registered as an individual project on a campus basis.
backup energy source
NC-2009 EAp2:Minimum energy performanceposted by Francesco Passerini on
Hello. I’m dealing with the calculation method for the credits relative to EA section. I don’t understand the meaning of the following sentence of paragraph G2.4 of ANSI/ASHRAE/IESNA STANDARD
SEER of split AC unit
NC-2009 EAp2:Minimum energy performanceposted by Jatuwat Varodompun on
In Thailand, there is no SEER testing as indicated for a small air conditioners in table 6.8.1A of ASHRAE 90.1 standard. Only EER is normally required to be tested here.
Table EAp2-5
NC-2009 EAp2:Minimum energy performanceposted by Isabel Santos on
Dear all, I am having one difficulty in filling the form of EAp2.
Exterior Lighting not yet designed
NC-2009 EAp2:Minimum energy performanceposted by Maya Karkour on
Dear All, I am modeling a project which still has no exterior lighting design (the owner will decide on this when the building is almost complete). In the preliminary design review, I put the val