Forum quick links
Old HVAC equipment transferred from other site
NC-2009 EAp2:Minimum energy performanceposted by Yastimy Jupson on
Hello, I have a new factory project recently. The owner wants to transferred old HVAC equipment from their old factory to this new factory.
Water heaters
NC-2009 EAp2:Minimum energy performanceposted by Paula Hernandez on
I have to model a building which is using solar pannels electric heaters.
Construction Assemblies
NC-2009 EAp2:Minimum energy performanceposted by Henrique Mendes on
We also were questioned regarding the construction assemblies used.
Manufacturing - prorate energy model
NC-2009 EAp2:Minimum energy performanceposted by Dave Hubka on
Hello Marcus, Projects pursuing CS certification are allowed to prorate the model based on owner control.
Do we have to include unconditioned spaces in the 3D model?
NC-2009 EAp2:Minimum energy performanceposted by Maya Karkour on
Dear All, I want to model a school project with 3 unconditioned basement floors hosting a car park. Do we really need to draw these spaces in the 3D model of the simulation, or can we just calcul
Modeling DOAS System efficiencies
NC-2009 EAp2:Minimum energy performanceposted by Brandon Frey on
I am modeling a geothermal heat pump system with a geothermal heat pump DOAS unit.
Baseline system types and building area
NC-2009 EAp2:Minimum energy performanceposted by Jatuwat Varodompun on
We have the project of to 250,000 sq ft. The Air conditioned area is only 50,000 sq.ft. The rest is enclosed unconditioned area (No HVAC) of 200,000 sq.ft.
Core performance guide option
NC-2009 EAp2:Minimum energy performanceposted by mohammed alshaikhsalama on
Hi, The project intents to follow option 3 Perspective compliance path Advanced Building Core Performance Guide.
LEED boundary and Major Additions
NC-2009 EAp2:Minimum energy performanceposted by Len Sciarra on
A new project, under LEED-NC, is a major addition to an existing building, in this case a manufacturing facility which will result in basically three sections New Office, Existing Office, and Exist
LEED v2009 Minimum Energy Performance Calculator
NC-2009 EAp2:Minimum energy performanceposted by SAMY Chamy on
Dear Concern:- 1.Is the LEED v2009 Minimum Energy Performance Calculator sheet is mandatory for LEED 2009 project submission 2.what is the difference between Revised Section 1 4 Tables (Jan 201