Selecting system type
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
We have a project that consists of both residential and non residential units. Per 90.1 2007G3.1.1 exception a. we need to use two HVAC system types for residential and non-residential separately.
California Projects using Title 24-2013
NC-2009 EAp2:Minimum Energy Performanceposted by Cindy Quinn on
To comply with California codes we had to show compliance with Title 24-2013. This required us to use the proprietary program Energy Pro 6.
How to model the ventilation system for baseline model.
NC-2009 EAp2:Minimum Energy Performanceposted by La Verne Ramir Certeza on
Hello, I would just like to ask regarding how I should model the ventilation system of my baseline model. My project is a hotel building which uses chilled water as its main cooling medium.
Using Desiccant Dehumidification - What about the Baseline?
NC-2009 EAp2:Minimum Energy Performanceposted by Mark Benson on
In some cases, such as Hospital operating rooms and Ice Rinks, you have to maintain indoor air dewpoint temperaturs lower than 44 F.
Energy Modeling for Design Sumittal
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All:- we plan to submit a project in Design stage so please advise how to do energy model in design model what are the major changes in energy model between Design and Construction submission
HAP boiler input data
NC-2009 EAp2:Minimum Energy Performanceposted by PAWAN DAHIWAL on
is estimated max load reported in HAP boiler input data for baseline case same to that of total heating capacity reported in Table 1.4 HVAC (water side) for baseline???. In one of the project Est
Heat recovery and dehumidification
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
In a swimming pool removing latent heat is necessary all the year round. For the baseline model, if I model the heat recovery according to G3.1.2.10 Exhaust Air Energy Recovery (50% both sensible a
Diesel generator for peak shaving
NC-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi, I'm involved in a project which will regularly use a diesel generator for peak shaving. May I use this strategy ir order to verify compliance with EA.p2 and take credit in EA.C1?
Task light process load or lighting load?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
I saw some people say task light is process load but sometimes it can be count into lighting power. I wonder is there a good way to treat task light?