Square feet calculation

NC-2009 EAp2:Minimum energy performance
posted by  LORENZO ORSENIGO  on 

Hello, we are working on a project LEED C&S in 2009 of approximately 100,000 square feet. The property doesn't want to implement the energy modeling due to economic issues. Since the project is

1
Mon Sep 9, 2013, 2:25 pm

Chiller Minimum Equipment Efficiency nonstandard conditions

NC-2009 EAp2:Minimum energy performance
posted by  Adriana Hansen  on 

The project team has specified a centrifugal chiller of over 600 Tons with a nonstandard conditions. It has been sent an AHRI certificate showing the compliance with ASHREA 90.1-2007 and 2010.

1
Wed Jul 2, 2014, 3:54 pm

Service Hot Water Efficiency Proposed vs. Baseline

NC-2009 EAp2:Minimum energy performance
posted by  Paul Bohres  on 

How do you account for the difference in service hot water efficiency from the proposed design to the baseline design if the proposed design is using electric point-of-use water heaters?

1
Wed Feb 23, 2011, 6:56 pm

Is waste heat district energy?

NC-2009 EAp2:Minimum energy performance
posted by  Haojie Wang  on 

We have a project that use heat recovery chiller to recovery heat from the waste heat from a nearby data center.

1
Thu Jan 7, 2016, 2:52 pm

Energy Modeling and LEED

NC-2009 EAp2:Minimum energy performance
posted by  Lisa Abraham  on 

We are creating a Revit model using Revit 2014. Going for LEED2009, (ASHRAE 90.1-2007). Do we need two models? Thinking of bringing model into eQUEST. Is that necessary to determine baseline vs.

1
Wed Jul 2, 2014, 3:52 pm

ASHRAE mandatory provisions for existing building

NC-2009 EAp2:Minimum energy performance
posted by  Wei Jiang  on 

Our project is a major renovation project. Do the ASHRAE mandatory provisions apply to existing systems/components that are not altered?

1
Tue May 31, 2011, 2:00 pm

Zone Isolation (HVAC 6.4.3.3.4)

NC-2009 EAp2:Minimum energy performance
posted by  Alex Parella  on 

Our office building (Major Renovation v3 2009), located at 3C climatic zone, doesn’t exceed 25,000 ft2 of conditioned floor area, but has more than one floor. Different users will have their own s

1
Thu Mar 14, 2013, 4:42 pm

ASHRAE STANDARDS 90.1 Appendix G - Humidity Controls

NC-2009 EAp2:Minimum energy performance
posted by  Curtis Clark  on 

Appendix G does not address humidity controls.

1
Fri Oct 18, 2013, 8:47 pm

Hvac - Baseline System Descriptions

NC-2009 EAp2:Minimum energy performance
posted by  Marina Andrade  on 

Hi, I am trying to classify an HVAC System (for the Baseline model) of 3731 m2 distribuited on 6 conditioned floors (HealthCare facilities). Checking the Table G3.1.A (Ashrae 90.1-2007) apparentl

1
Wed Mar 20, 2013, 6:41 pm

weather data

NC-2009 EAp2:Minimum energy performance
posted by  Tarek Dalati  on 

i m using HAP 4.41 for HVAC load calculation and energy modeling but unfortunatly the weather data available is hourly average s it ok to use for leed energy simulation or i ahve to go to another f

1
Mon Sep 19, 2011, 5:21 pm