Equipment as per table 6.8.1.A 90.1-2007
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, In the project we are modeling, there are air conditioners which are supposed to operate in cooling mode at OA temperature close to the design heating OA. In this table and also in othe
Cogen Gas Rates
NC-2009 EAp2:Minimum Energy Performanceposted by Wes Lawson on
Hello all, We are attempting to model a cogen system (using gas to create electricity and using waste heat for domestic water heating). My questions are as follows: 1.
District virtual rate:
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
We have project using district steam. We use DES v2 to calculate the virtual rate based on state averaged electricity (0.084$/kWh) and gas (0.00757$/MBTU).
Air leakage through revolving door
NC-2009 EAp2:Minimum Energy Performanceposted by Claes Engström on
Hi ! According to building envelope compliance documentation Part I, revolvning doors should have air leakage less than 1,0 cfm/ft2. A manufacturer of revolving doors informed me that all revolvin
Minimum HVAC equipment efficiencies
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
The project seeking LEED certification includes air-to-water heat pumps (4-pipe), that are able to produce hot and chilled water (simultaneously or separetly).
Selection baseline cooling system for industry process
NC-2009 EAp2:Minimum Energy Performanceposted by Roberto Oshiro Gama on
I am trying to select the baseline cooling system of a food industry.
Table 9.4.5 basketball court
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I’m modeling a project where there is an external basketball court, which is illuminated. I’m considering Table 9.4.5 “Lighting power densities for building exteriors” for the baseline model.
Underground Floors
NC-2009 EAp2:Minimum Energy Performanceposted by Redy Truccolo on
Hi, I'm doing a LEED certification and I have a three floors office building, with three underground floors for parking purposes only. These three underground floors have NO HVAC system, they are
Existing Building Renovation with an Addition
NC-2009 EAp2:Minimum Energy Performanceposted by Evelyn Dicks, EI, CxA on
Hello everyone, I'm working on a project where an existing building is being renovated but there is also a smaller new addition extending the building.
Minimum equipment efficiencies ASHRAE 90.1
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
Can anyone please clarify if packaged air-to-water heat pumps (chilled and/or hot water production) have to: 1) comply with minimum efficiency requirements set to for water chilling packages in coo