Proposed Design HVAC Capacities
NC-2009 EAp2:Minimum Energy Performanceposted by AshLee Eustace on
Should heating and cooling capacities for the proposed design be modeled the same as the baseline (15% and 25% over-sized) or should they be modeled with actual capacities? Thank you
Baseline Chilled water pumps - G3.1.3.10
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, The standard states that the pump power must be 22 W/gpm. If the project has two chillers and primary secondary circuits, whereby there is on pump per chiller in the primary circuits and
90.1 compliance mandatory? Planned use of empty space?
NC-2009 EAp2:Minimum Energy Performanceposted by David Weigel, PE on
Sorry for a couple of elementary questions, but my searches haven't been successful. 1. Is 90.1 compliance required, or only the mandatory provisions? 2.
Requirements for instant water heater with no storage tank
NC-2009 EAp2:Minimum Energy Performanceposted by Gustavo De las Heras Izquierdo on
Hallo, I have read the insulation requirements in Section 7.4.3 but it seems to focus on circulating and non-circulating systems with a storage tank.
Existing systems modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Tiffany Moore on
If a project retains existing mechanical systems, but the overall scope of the renovations meets the new construction threshold, are the baseline calcs based on code-minimum or should the project a
Hotel Room Lighting Exceptional Calculation
NC-2009 EAp2:Minimum Energy Performanceposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
We would like to apply the exceptional calculation method for guest room lighting in a 165-unit hotel.
New LEED Requirements?
NC-2009 EAp2:Minimum Energy Performanceposted by Curtis Clark on
LEED Reviewers are implementing new requirements for the baseline building (LEED NC v2.2 EAp2 VAV System) through the comment process.
IES ApacheHVAC - Proposed system for VRF
NC-2009 EAp2:Minimum Energy Performanceposted by Alice chen on
Hi All, I am modelling a VRF system using ApacheHVAC in IES. But have no idea which prototype to choose.
Exterior LPD for Block Project
NC-2009 EAp2:Minimum Energy Performanceposted by Katherine Ann Resurreccion on
We registered a block project; the Campus boundary includes land scape, existing non-LEED buildings and two LEED certification candidate buildings.