Fans pressure - Baseline and Proposed
NC-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi, I have a doubt related to the pressure to be considered for the baseline and proposed fan power.
Process Energy - Difference between Proposed & Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Dear all, Can someone please advise on what are the conditions to claim an exceptional calculation for process energy, for having the proposed process energy less than the baseline's? For example
Appendix G - Type of system
NC-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi, I have a doubt related to the type of system I should consider in a specific case. I'm working on a project where most of the bulding is served by one type of system.
VRF / VRV ASHRAE Standard 90.1-2007 ACCORDING
NC-2009 EAp2:Minimum Energy Performanceposted by Diego Escalona on
Hello friends, Anyone have the feedback of USGBC where equipment are ranked VRV / VRF to require minimum efficiencies ASHRAE Standard 90.1-2007 according in LEED 2009, or someone has this notion?.
Evidence of efficiency
NC-2009 EAp2:Minimum Energy Performanceposted by Rudolph Carneiro on
1) We received data sheets from a set of construction documents that specify minimum efficiencies of chillers to be purchased.
Multiple buildings simulation
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
Hello, We are working on a project that has been registered as one single project (NC 2009), but it actually corresponds to three buildings, one is a laboratory, another a distribution storage and
Microclimate conditions versus Climate zones by ASHRAE
NC-2009 EAp2:Minimum Energy Performanceposted by Esteban Undurraga on
Hi there, sorry for the long intro and thank you in advance for any feedback, We're trying to specify our Climate data file for LEED simulation purposes.
Drawings showing location of Daylight Sensors
NC-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Dear all, We are modelling an office tower under LEED C&S 2009.
Energy Performance after LEED Award
NC-2009 EAp2:Minimum Energy Performanceposted by Steven Er on
In MPR, all LEED certified project must commit to sharing with USGBC and/or GBCI all available actual whole-project energy data for a period of a least 5 year. I assume building energy performance
Existing building constructions with new data center
NC-2009 EAp2:Minimum Energy Performanceposted by Ross Farris on
Hello, I am going to be modeling an existing building for 2009 NC and we are adding a large data center to an interior space on the top floor of this building.