Post a question or comment
Credit Filters
Minimum Energy Performance
Filter by location
Forum
Topic
Replies
Recent

Elevators - Energy Consumption - Sources

NC-2009 EAp2:Minimum Energy Performance
posted by  Marcio Alberto Casado Pereira  on 

Hi, Is there any kind of Leed / Ashrae valid procedure to calculate / consider Elevators Energy Consumption? Thanks in advance.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Feb 1, 2013, 6:12 pm

Relationship with other existing buildings

NC-2009 EAp2:Minimum Energy Performance
posted by  FABIO VIERO  on 

Hello all. We are working on a building whose reversible heat pump serves also another building not included in the LEED boundary. How do we have to consider this situation?

9
Thu Jan 31, 2013, 6:38 pm

Part of Factory is designed but won't be installed now

NC-2009 EAp2:Minimum Energy Performance
posted by  Valentin Grimaud  on 

Dear community, I am wondering how I should read the language of the 90.1 in the following case: - My project includes lots of process and related HVAC, which have been designed to 90% completion

3
Thermal Engineer
TERAO Green Building Engineering
LEEDuser Basic Member
28 thumbs up
Thu Jan 31, 2013, 1:56 pm

VRF efficiency requirements

NC-2009 EAp2:Minimum Energy Performance
posted by  Rudolph Carneiro  on 

Hello; Question; Are VRF sistems exempt from the efficiency requirements of 90.1-2007? Section 6.4.1.3 states that equipment not listed can be used. If they are exempt, why?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jan 30, 2013, 8:44 pm

cold room and energy sim

NC-2009 EAp2:Minimum Energy Performance
posted by  Jatuwat Varodompun  on 

We are working a factory which has a small freezer room of 200 sf. How should we model this part?

5
Tue Jan 29, 2013, 9:37 pm

GLASS CURTAINWALL

NC-2009 EAp2:Minimum Energy Performance
posted by  LEED Pro Consultant  on 

Hello! I would like to know from those who have worked with curtain walls, which U value do you take from ASHRAE for the baseline of the project.

4
Mon Jan 21, 2013, 5:51 pm

semi-heated spaces

NC-2009 EAp2:Minimum Energy Performance
posted by  PAWAN DAHIWAL  on 

What will be the effect on energy consumption if i model conditioned (warehouse) space as semi-heated space by using system type#9 or #10 in baseline. my dominant baseline system type is #5 (VAV)

4
Fri Jan 18, 2013, 5:05 pm

System #7 for undesigned space

NC-2009 EAp2:Minimum Energy Performance
posted by  Erika Duran  on 

I am working on a residential building, with more than 20,000 SF of conditioned non residential spaces, so I am using System #7 for non residential spaces.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Jan 18, 2013, 3:35 pm

Interpreting CIR#1712

NC-2009 EAp2:Minimum Energy Performance
posted by  Yoyo Shek  on 

Dear All, I have a question in modelling the lighting power density for high-rise residential development.

4
Default Avatar
Allied Environmental Consultants Limited
LEEDuser Basic Member
3 thumbs up
Thu Jan 17, 2013, 2:39 pm

"Push button" instead of "Occupancy sensor"

NC-2009 EAp2:Minimum Energy Performance
posted by  Maya Karkour  on 

Dear All, To benefit from a lighting power reduction, our project is proposing installing push-button switches in the communal stairs. I know that in ASHRAE Appendix G, table G3.2 allows for a 10%

4
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Tue Jan 15, 2013, 12:16 am