High bay Areas LPD
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
We are working on a project with a bus repair bay areas for which we considered as "High Bay" areas for the energy model due to the fact that these areas are higher than 25 ft.
Unmet Load Hours
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
HVAC plans show the room setpoint. This should be the OPERATIVE temperature.
Existing Envelop is unknow
NC-2009 EAp2:Minimum Energy Performanceposted by Anil Bhari on
As per requirement G3.1.5(f) baseline, any existing envelope, the baseline building design shall reflect existing conditions prior to any revision.
ASHRAE Mandatory provisions 10.4
NC-2009 EAp2:Minimum Energy Performanceposted by Elena Grau on
Hello, I’m currently working on a LEED NCv2009 project located in Spain. My question is about the compliance of the section 10.4.1 (Electric Motors) of ASHRAE 90.1-2007.
Light Scheduling
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
1) Assume the same scheduling is used in both design and baseline case, may I schedule lights to be off during occupied hours in a zone (both baseline and design models)? 2) Taking this a step furt
Central Plant providing energy to more than one buildings
NC-2009 EAp2:Minimum Energy Performanceposted by Therese Malm on
Hi, We have a project where the Central Plant, consisting of a geothermal heat exchanger, is considered to provide energy to more buildings than the building seeking LEED certification.
Ventilation requirements for naturally ventilated spaces
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
A difficalt case: Radiant floor + Nat Vent LEED increased ventilation credit requires that when using the macroscopic airflow simulation compliance path for naturally ventilated spaces: 1) 90% of t
Radiant Floor Heating with Natural Ventilation
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
Hi Group, I have a project with only Radiant Floor Heating with Natural Ventilation. I have modeled both baseline and proposed with the baseline HVAC for cooling (the missing system).
Green Roofs, High Albedo Roofs and U-factor Assembly values
NC-2009 EAp2:Minimum Energy Performanceposted by Guillermo T. Adamo on
Hi, we are working on a project with green roofs in climate 3b.
Hot Water - 3 Fuel Sources - Baseline Model
NC-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
Hi, We are Energy modelling a project with 3 types of systems to heat water: 1.- Solar Collector 2.- Electrical Heat Pump 3.- Hot water Boiler - Gas For the "BASELINE" model, should I model the