FAQs about EAp2 :

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

ASHRAE Mandatory provisions 10.4

Hello, I’m currently working on a LEED NCv2009 project located in Spain. My question is about the compliance of the section 10.4.1 (Electric Motors) of ASHRAE 90.1-2007. Should an European building comply with the requirements of the Energy Policy Act of 1992? Thank you very much. Best regards,

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 06/14/2013 - 18:01

Electric motors must meet the requirements in the efficiency table regardless of the location of the project. Keep in mind that there a various exemptions from the efficiency requirements for electric motors. They must be base mounted, single speed, 3 phase, etc..

Mon, 06/17/2013 - 08:00

I Thought I have seen somewhere that the equivalence with the energy Policy Act is that the motors should be at least IE2 class.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.