Forum quick links
No HVAC / Natural Ventilation - Unmet Hrs
NC-2009 EAp2:Minimum Energy Performanceposted by Chad Coleman on
Hello, I am currently working on a LEED NCv2009 project which includes a small building ~1,150sf, and has 200sf of regularly occupied space.
Proposed ERV vs. Baseline VAV
NC-2009 EAp2:Minimum Energy Performanceposted by Laura Long on
I have a question regarding G3.1.2.8. Per this section a return fan is required for the baseline system if there is a return fan in the proposed model.
Fan power BaseLine
NC-2009 EAp2:Minimum Energy Performanceposted by VICTOR MORENO on
Hello everybody, I´m simulating a LEED Project. When calculating the powers of the fans as G3.1.2.9, the result is adequate.
regularly occupied sf
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
1) Why is column regularly occupied sf in leedonline EAp2-1 table needed? 2) We have filled out EAp2-1 as per the spaces used in the energy model, not the project per say...i.e.
Exterior Lighting for Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
Should we use the power density of the 90.1 without addenda or should we use the addendum I for the "baseline" of the energy simulation of EAp2?
Minimum/Mandatory Requirements for, VAV TU?
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Torres-Coto on
I have a Tenant Improvement that has VAV terminal units connected to an existing VAV AHU. The contractor and owner decided to save money and utilize stand alone control.
Chillers COP consideration equivalent
NC-2009 EAp2:Minimum Energy Performanceposted by Mohd Imran Shaikh on
Hi There, We are looking into a project which an office building and is going to be LEED certified.
Proposed v Baseline Outdoor air
NC-2009 EAp2:Minimum Energy Performanceposted by Joseph Snider on
I am working on a multifamily building. The proposed system is a Rooftop unit with constant vlume and 100% outdoor air.
Unconditioned Spaces
NC-2009 EAp2:Minimum Energy Performanceposted by Laura Long on
While modeling the building in the space-by-space method, there are a couple of closets that are not conditioned, therefore have been model as unconditioned in TRACE 700.
Task Lighting
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
I have two questions concerning Task Lighting: 1- for an office building, should I count task lighting as process load? 2- For Base-case Simulation, does the LPD limit set by ASHRAE 90.1 include