Data Centers in LEED v3 - exceptional calculation method?
NC-2009 EAp2:Minimum Energy Performanceposted by Jeremy Rapoza on
I have a relatively large data center (200kw connected load) in a relatively larger building (250k sf) so that the data center is not the major program space, but is a relatively large minority of
Pressure Drop adustment in Section 14 Tables
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
Actually I'am not able to correlate section 14 required inputs under pressure drop column "CFMd", and the requirements of ASHRAE TABLE 6.5.3.1.1 B in (pascals/ in.w).
Spaces left for future use should be simulated as conditionned?
NC-2009 EAp2:Minimum Energy Performanceposted by Valentin Grimaud on
Dear community, I have a project where some spaces will be left for future use, while most of others are designed and built for immediate use.
Electric Shower
NC-2009 EAp2:Minimum Energy Performanceposted by SW LEE on
Our project is at South East Asia, do we need to comply to ASHRAE 90.1 on electric shower?
Using a newer version of 90.1 than what LEED specifies
NC-2009 EAp2:Minimum Energy Performanceposted by Dave H on
I am working on a project that was registered under LEED NC 2.2. Will the USGBC allow us to apply requirements from 90.1 - 2010 to the project instead of 90.1 - 2004?
Baseline HVAC system for residential building
NC-2009 EAp2:Minimum Energy Performanceposted by LEED Pro Consultant on
Hello, We are working on a residential project where the HVAC system won´t be provided for the apartments, the project scope contemplates the preparation and space for the equipments so every own
Future Building as a Shadowing Element
NC-2009 EAp2:Minimum Energy Performanceposted by Gabriela Crespo on
Dear all, We are working on a single building certification that is located within a two tower project.
UPS - To be or not to be included in Energy Star Calculation?
NC-2009 EAp2:Minimum Energy Performanceposted by Graeme Smith on
I have two questions regarding the inclusion of UPS in the 'Energy Star' calculation in LEED v2009. Q1. The LEEDv2009 Reference Guide language says...
Water cooled chillers for very dry areas
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
Dear forum, We have a very critical problem for a LEED C&S 2009 project located in the north of Mexico. The project will be a 13th story office building.
U Value & SHGC
NC-2009 EAp2:Minimum Energy Performanceposted by SSN Energy Model on
Hi, We are in the process of doing Energy Simulation for Garments Factory. We have completed the base case part and proposed case is pending.