Data Centers in LEED v3 - exceptional calculation method?

NC-2009 EAp2:Minimum Energy Performance
posted by  Jeremy Rapoza  on 

I have a relatively large data center (200kw connected load) in a relatively larger building (250k sf) so that the data center is not the major program space, but is a relatively large minority of

3
Default Avatar
Engineer
Tighe & Bond
LEEDuser Basic Member
7 thumbs up
Tue Apr 8, 2014, 8:18 pm

Pressure Drop adustment in Section 14 Tables

NC-2009 EAp2:Minimum Energy Performance
posted by  Omar Elrawy  on 

Actually I'am not able to correlate section 14 required inputs under pressure drop column "CFMd", and the requirements of ASHRAE TABLE 6.5.3.1.1 B in (pascals/ in.w).

7
Green Building Consultant | Researcher
GreenA Consultants
LEEDuser Basic Member
38 thumbs up
Mon Apr 7, 2014, 2:31 pm

Spaces left for future use should be simulated as conditionned?

NC-2009 EAp2:Minimum Energy Performance
posted by  Valentin Grimaud  on 

Dear community, I have a project where some spaces will be left for future use, while most of others are designed and built for immediate use.

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Fri Apr 4, 2014, 10:02 am

Electric Shower

NC-2009 EAp2:Minimum Energy Performance
posted by  SW LEE  on 

Our project is at South East Asia, do we need to comply to ASHRAE 90.1 on electric shower?

3
Default Avatar
Project Manager
LEEDuser Basic Member
2 thumbs up
Sun Mar 16, 2014, 8:09 pm

Using a newer version of 90.1 than what LEED specifies

NC-2009 EAp2:Minimum Energy Performance
posted by  Dave H  on 

I am working on a project that was registered under LEED NC 2.2. Will the USGBC allow us to apply requirements from 90.1 - 2010 to the project instead of 90.1 - 2004?

8
Default Avatar
LEEDuser Premium Member
19 thumbs up
Thu Mar 13, 2014, 1:22 pm

Baseline HVAC system for residential building

NC-2009 EAp2:Minimum Energy Performance
posted by  LEED Pro Consultant  on 

Hello, We are working on a residential project where the HVAC system won´t be provided for the apartments, the project scope contemplates the preparation and space for the equipments so every own

5
Wed Mar 12, 2014, 10:31 pm

Future Building as a Shadowing Element

NC-2009 EAp2:Minimum Energy Performance
posted by  Gabriela Crespo  on 

Dear all, We are working on a single building certification that is located within a two tower project.

5
Thu Mar 6, 2014, 8:43 pm

UPS - To be or not to be included in Energy Star Calculation?

NC-2009 EAp2:Minimum Energy Performance
posted by  Graeme Smith  on 

I have two questions regarding the inclusion of UPS in the 'Energy Star' calculation in LEED v2009. Q1. The LEEDv2009 Reference Guide language says...

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Mar 3, 2014, 2:22 am

Water cooled chillers for very dry areas

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Rodriguez  on 

Dear forum, We have a very critical problem for a LEED C&S 2009 project located in the north of Mexico. The project will be a 13th story office building.

2
Default Avatar
Building Systems Commissioning Engineer
Empirical Engineering, LLC
LEEDuser Basic Member
14 thumbs up
Thu Feb 27, 2014, 5:22 pm

U Value & SHGC

NC-2009 EAp2:Minimum Energy Performance
posted by  SSN Energy Model  on 

Hi, We are in the process of doing Energy Simulation for Garments Factory. We have completed the base case part and proposed case is pending.

4