Forum quick links
Appendix G system type for addition
NC-2009 EAp2:Minimum Energy Performanceposted by Hilary Giffen on
I have an addition to a manufacturing plant. The addition has its own HVAC system so the LEED boundary encompasses just the addition.
Template v2009 EAp2 filling doubts
NC-2009 EAp2:Minimum Energy Performanceposted by Luis Andrade on
Hello,
Exceptional calculation in newer credit templates for v3 (2009)
NC-2009 EAp2:Minimum Energy Performanceposted by Jill Kurtz on
The exceptional calculations used to be entered into the LEED template but with the streamlined templates, the tables are no longer included in the form.
EAp2 for a Lab Building
NC-2009 EAp2:Minimum Energy Performanceposted by Roxanne Button on
I have been brought into this project as the LEED consultant at a very late stage (about to start construction).
Minimum Efficiency Requirements for combined split type unit
NC-2009 EAp2:Minimum Energy Performanceposted by sompoche sirichote on
Hi LEED Expert,
More Stringent Energy Codes
NC-2009 EAp2:Minimum Energy Performanceposted by Jason Cocek on
Does anyone know if there was a point where the IECC became more stringent than ASHRAE 90.1-2007 that is generally accepted by reviewers or is it always necessary to upload justification that the c
How to model HVAC system in Baseline model for Group approach Project
NC-2009 EAp2:Minimum Energy Performanceposted by soham babu on
Hi All,
Existing Buildings
NC-2009 EAp2:Minimum Energy Performanceposted by David Tratt on
Do I understand correctly from 90.1 Table G3.1 item 5f for baseline building that I can input the existing envelope conditions in the baseline model in lieu of the 90.1 minimum envelope requiremen