Commissioning of a factory machine
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jatuwat Varodompun on
Does it need to include Machines (to produce goods) in the scope LEED CxA?
Who can be CxA?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Allan Vásquez on
Hi, I’m looking for some help with the Commissioning Authority experience.
Multi-family Mid-rise EA Pre-req 1 - Option 2
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Pournamasi Rath on
Hi, I have a quick question regarding LEED for Homes Multi-family Mid-rise EA Pre-req 1 - Option 2 (see reference document here - http://www.usgbc.org/sites/default/files/Energy%20and%20Atmosphere%
On-site, third party owned solar
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Nicholas Bristow on
Our project has an on-site, third party owned Solar PV system.
When Fundemental Commissioning Should start
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jalal Avades on
We have a project that is currently in construction and the client would like to go LEED.
clarification question on credit
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Melissa Elkins on
Our Engineering firm didn't include our water heating system in the original commissioning report, so our credit needs to be clarified - they did conduct a functional test so I'm wondering if I jus
Sample LEED 2009 Basis of Design Document
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Robert Shields on
I have a sample Basis of Design document that applies to LEED 2.2. Not sure if there are any differences in the requirements for the document required in LEED 2009.