Find buried fuel oil 2 tanks!!!

NC-2009 SSc3:Brownfield Redevelopment
posted by  javier bolanos zeledon  on 

This is a 5000sq ft office building to be built in an existing building. When they dig the columns foundations they discovered two fuel oil 2 tanks.

1
Wed May 4, 2011, 10:07 am

Local voluntary cleanup program - definition

NC-2009 SSc3:Brownfield Redevelopment
posted by  Anna Korinkova  on 

Under Option 1 of the credit, we can pursue EITHER the ASTM E1903-97 Phase II Environmental Site Assessment OR the 'local voluntary cleanup program'.

3
Mon Mar 13, 2017, 4:52 pm

Asbestos Remediation

NC-2009 SSc3:Brownfield Redevelopment
posted by  Jeannie Rueter  on 

The first phase of our Job Corps project was to construct a new cafeteria on campus. The second phase is to demolish the old cafeteria. The old cafeteria has asbestos in it.

2
Wed Mar 9, 2016, 4:29 pm

Brownfield site but graded before the construction started

NC-2009 SSc3:Brownfield Redevelopment
posted by  Michael Wahjudi  on 

Our site is brownfield (existing navy base), but the site is being graded before 1980 to be prepared as industrial area. The current construction activity start at 2014.

2
Principal
Studio4, LLC
LEEDuser Expert
120 thumbs up
Tue Jun 9, 2015, 4:02 am

State DEQ-Listed Brownfield Site - credit denied

NC-2009 SSc3:Brownfield Redevelopment
posted by  Michele Otazua  on 

In our first review, our credit was denied. We are on a zero lot line property with the building occupying the entire site, but the site is listed on the state DEQ register of brownfield sites.

2
Principal
Studio4, LLC
LEEDuser Expert
120 thumbs up
Mon Jan 26, 2015, 9:00 pm
2
Principal
Studio4, LLC
LEEDuser Expert
120 thumbs up
Tue Nov 25, 2014, 7:00 pm

Military Base contamination

NC-2009 SSc3:Brownfield Redevelopment
posted by  Kim Lombard  on 

Our client on a Military base has uncovered asbestos piping underground during construction. They have properly disposed of the contamination as a normal SOP.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Jul 30, 2014, 1:34 pm

Asbestos Abatement Documentation

NC-2009 SSc3:Brownfield Redevelopment
posted by  Heather Holdridge  on 

We are developing on an existing site that requires asbestos abatement, so we're pursuing this credit under the third option.

8
Default Avatar
AIA, LEED FELLOW
LEEDuser Basic Member
9 thumbs up
Thu Jul 17, 2014, 5:55 pm

Brown Field redevelopement

NC-2009 SSc3:Brownfield Redevelopment
posted by  Sahar Abi-Ziki  on 

Hello, Due to budget issues, our client wants to decontaminate a portion of the site and not the entire site (only the areas were we are doing interventions).

2
Principal
Studio4, LLC
LEEDuser Expert
120 thumbs up
Thu Feb 6, 2014, 3:07 pm

Hexavalent Chromium on groundwater

NC-2009 SSc3:Brownfield Redevelopment
posted by  eirini matsouki  on 

Hi all, Our project is international and is under construction. We are keeping this credit on a stand-by, as during the design submission there was not any evidence of contamination.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Feb 4, 2014, 6:41 pm