ESC Plan for International projects
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Razan Nejem on
according to the prerequistes language the ESC plan must conform to the construction general permit and the plan must describe the measures implemented to accomplish the following objectives: To p
Sediment Basin / Trap
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Samer Alhmdan on
Can we use the Infiltration Pond which is originally design for storm water collection during the operation phase of the project, can we use it as sediment trap during construction phase, noting th
Can a Graded Pad Site Meet SSp1?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Michael Hoffner on
Our client has purchased a graded pad site from a developer and wants to build a LEED certified project.
SSp1 / ESC plan and the Multi-Building Campus Guidance
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Laura Billings on
Hi there - I'm working on a 4-building office campus that is being developed all in one phase.
Are there LEED Credits for AFV transporting materials to jobs?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Rob Flammang on
I am not sure if this would fall under SSp1 or SSc4.3 but I am not seeing any provisions when it comes to the transportation of materials to a construction site.
LPE for QSD
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Ida Clair on
In California can a Construction General Permit Qualified SWPPP Developer (QSD) sign a LPE instead of a registered civil engineer?
Sign board at construction site entrance
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Keerthi Ratnayake on
Hi, We intend to erect a sign board at the construction site entrance. "THIS IS A LEED SITE". Is this against the USGBC guidelines?
SSp1 ESC plan implementation narrative
NC-2009 SSp1:Construction Activity Pollution Preventionposted by H.K.C.B. Heendeniya on
Dear community, I'm struggling with writing the narrative for implementation of ESC plan. My main problem is that I'm not sure what level of details are expected.
How long must we follow thru on erosion control log?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Donald Bauman on
Our building and site is complete except for the grass. It was hydro-seeded last week but the grass that has taken is less than 75%.
Air with dust particulate matter
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Jatuwat Varodompun on
If my site provide the truck wheel washing and inspection plan for this activity, will it be qualify as a measure for reducing Air with dust particulate matter? I just got the comment to provide t