Energy and water reporting missing
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Maria Perzon on
Hi
How is energy and waterconsumption data collected?
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Maria Perzon on
Hello,
Who (in the project organization) gets the notifications from USGBC to hand in the energy and water usage data (~Two times per year?)
Campus Project
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by P Fanfulik on
I have a project consisting of two buildings which was registered as a campus project. When using Portfolio Manager, am I required to benchmark as a campus?
Is data being gathered and used?
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Bill Swanson on
We commit to allowing USGBC to have access to our energy and water meter data from the Utilities. Does USGBC follow up and collect this building data for all v2009 projects?
Water meters to each tenant area.
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Ciaran McCabe on
I assume that waters are not required at each tenant level. Would one water meter for the building suffice the min requirements ?
Water Reporting via approved methods
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Sara Goenner Curlee on
As I look through the two options to report energy and water usage, I'm a little unclear how one exactly reports the water consumption of a building.
Building Metering and Utility Metering
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Becky Dix on
On a higher ed project, there is proposed metering of all energy and water usage for the LEED building that can be read from the building automation system.
Completing PIF1 when you have an exception to providing meters
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Susan Di Giulio on
We are working on a municipal water processing plant.
ENERGY STAR Portfolio Manager
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Gregory Martin on
I am currently working on a template and it looks slightly different from the last project I worked on.
MPR #6 modification
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Ron Dean on
Hello, I've seen in leedonline for a recently registered project I'm working on that this form (PIf1) has been updated from version 4.0 to 5.0.