Forum quick links
Occupancy before building is finished
NC-2009 PIf4:Schedule and Overview Documentsposted by Victoria Rios Esteve on
Hi everyone! Im pretty sure this question is not rightly set in this category, but here we go...
Utility Trenches Part of Project Boundary?
NC-2009 PIf4:Schedule and Overview Documentsposted by Larry Turbes on
We're certifying a school addition and the site area associated is fairly straight forward except we have both power and sanitary utility connections that finger out beyond what would be a reasonab
PIf4 Overview Documents Uploading
NC-2009 PIf4:Schedule and Overview Documentsposted by Giancarlo Perossa on
Someone else posted the following (which I'm having trouble with, as well) elsewhere on leeduser: "I’m not sure I am successfully uploading pdf files on PIf4 at “Overview Documents”.
Appealing process
NC-2009 PIf4:Schedule and Overview Documentsposted by Jatuwat Varodompun on
I am about to appeal for my project. if some of the credits are denied again, can we try to correct the report or modify the building to comply with the requirment and appeal again?
Submit For Review
NC-2009 PIf4:Schedule and Overview Documentsposted by Matt Dem on
Does "submit For Review" tab under "Design Preliminary Review" ( LEED online - timeline ) allow me to review the credits that I am planning to submit one more time before I submit it OR does it
Lease Agreement an option to comply with the credit requirements
NC-2009 PIf4:Schedule and Overview Documentsposted by Katherine Ann Resurreccion on
Hi, We are currently documenting the requirements for PIf4 and our option in order to comply is to provide a Tenant/Lease Agreement for certain credits.
Uploaded drawings
NC-2009 PIf4:Schedule and Overview Documentsposted by Michael Beattie on
I've been waiting to upload the drawings for our project until the revisions generated by Owner and Contractor have been complete, and the drawings reflect what's actually being constructed.
Plf4 - upload L-4 & Plf4-3
NC-2009 PIf4:Schedule and Overview Documentsposted by Matt Dem on
What is specifically meant with " mechanical plans and / or drawings " for L-4 ? I think it is definitely floor plan layout but what about details ? Is the details sheet also needed ?
Project Mexico
NC-2009 PIf4:Schedule and Overview Documentsposted by Alejandro Macias on
I'm starting to work on the certification of a building in a small town in Oaxaca,Mexico .
Submitted drawings
NC-2009 PIf4:Schedule and Overview Documentsposted by Ashley Sadowski on
I have a general question regarding submitted drawings. We are at 100% DD's and wanted to create the documentation for the sustainable sites criteria.