Baseline of existing building with major renovation
NC-v4.1 EAp2:Minimum Energy Performanceposted by Mike Mentzos on
According to ASHRAE 90.1-2010 Table G3.1.5 (f) for existing building envelopes, the baseline building design shall reflect
Baseline Envelope
NC-v4.1 EAp2:Minimum Energy Performanceposted by Mike Mentzos on
I would like to confirm that in the case of Major Renovation the baseline is the same as New Construction
Energy Performance on Air Structured Dome
NC-v4.1 EAp2:Minimum Energy Performanceposted by Thomas Jangaard on
Hello,
LEED v4.1 Service water-heating system with DES purchased heat
NC-v4.1 EAp2:Minimum Energy Performanceposted by Manuel Romera Molina on
Hello everybody,
Errors in v4.1 MEPC Excel Sheet
NC-v4.1 EAp2:Minimum Energy Performanceposted by Junaid Mujahid on
What is the best way to resolve errors with the v4.1 MEPC?
Laboratory Spaces baseline system in warm climate and proposed building is electrified heating
NC-v4.1 EAp2:Minimum Energy Performanceposted by Russell Knudson on
For a project within warm Climate Zones 0 to 3A, and that has a "metal shop" space that requires more than 15,000 CFM, is it a correct reading that the baseline system serving those spaces shall ei
Standard for the baseline of the cold storage in a factory
NC-v4.1 EAp2:Minimum Energy Performanceposted by Michael on
My factory project has cold storage (10oC) and a freezer (-13oC).
Baseline lighting and lighting controls
NC-v4.1 EAp2:Minimum Energy Performanceposted by Samer Hassanie on
Hi,
I have two questions:
Baseline - Unconditioned Spaces
NC-v4.1 EAp2:Minimum Energy Performanceposted by Alvaro Twose on
Hello everyone,
According to ASHRAE 90.1-2010 and 2016 the following assumptions are described for the Baseline path definition (Appendix G):
Baseline Building DCV
NC-v4.1 EAp2:Minimum Energy Performanceposted by Luis Andrade on
Hi everyone,