Forum quick links
Rainwater Management in Colorado
EBOM-v4 SSc2:Rainwater managementposted by Jonathan Miller on
Does anyone know what the rules are on engaging in rainwater management in Colorado? I'm under the impression that this is against the law in the state.
Number of cycles
EBOM-v4 WEc3:Cooling tower water useposted by Jonathan Miller on
What is the number of cycles necessary to achieve 1 point? 10?
Minimum Floors Requirement for EB:OM v4 Existing Building
EBOM-v4 MPR3:Must comply with project size requirementsposted by Davide Filippi on
I have a question! I'm a student here!
What is an "Existing Buiding" for EB:OM?
EBOM-v4 MPR2:Must use reasonable LEED boundariesposted by Davide Filippi on
An existing, old and close building (nobody insiede for years, no heating system working...) can pursue a LEED EB:OM v4 Existing building?
ASHRAE Standard 62.1–2010, Sections 4–7
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Jonathan Miller on
Can someone list the minimum requirements of ASHRAE Standard 62.1–2010, Sections 4–7? Thanks much.
LTc1. possible 18 points
CI-v4 LTc1:LEED for neighborhood development locationposted by FRAGKISKOS LEVANTIS on
I do understand the logic behind giving a possible 18 points when locating in a LEED ND project. However, international projects, i.e.