NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by NESLIHAN AKSOY on
Buildings LCA is conducted to measure the impact of building materials..as well as building use etc.
cradle to gate scope?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Erin Holdenried on
Does the compliance with the ISO 14025 standard automatically include cradle to gate scope? Or is the scope stated separately in the product EPD?
Integrative Process (IP) Guide 2.0
NC-v4 IPc1:Integrative processposted by Vitor Tosetto on
Please, someone knows where can I buy the Integrative Process (IP) ANSI Consensus National Standard Guide© 2.0? In ANSI's webstore I found v1.0 only.
n/a
NC-v4 SSc4:Rainwater managementposted by Anastasia Makarenko on
Dear all, we're planning to install tank for collecting 180% of stormwater from 95 percentile rainfall event.
Indoor Water Use Reduction - Impossible to Achieve????
EBOM-v4 WEc2:Indoor water use reductionposted by Meier Corporate Account on
Our dairy was built in 2014 with the most water efficient toilets and sinks on the market. (Urinals use no water).
Calculating Work Surface in a Manufacturing Environment
EBOM-v4 EQc4:Interior lightingposted by Meier Corporate Account on
I am trying to fill out the Surface Reflectance tab of the Indoor Lighting spreadsheet. My project is in a 105,000 sq foot manufacturing plant.
Task Lighting
EBOM-v4 EQc4:Interior lightingposted by Katie Raymond on
It appears that typical under cabinet task lighting with just an on/off switch (no midlevel) will no longer satisfy this credit. Am I reading this correctly?
Data Centers Modeling Guidelines
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Paula Hernandez on
Hello, Is there such a thing?, a Guideline to model Data Centers?, where can I found it? Thank you
One model or various separate models
NC-v4 EAp2:Minimum energy performanceposted by Ana Paula Quiros on
Hello! We are working on a hotel, that rather than a single block consists of several blocks connected by walkways and they share the same parking lot. How should we consider the energy model?
Success with LCA option?
NC-v4 MRc1:Building life-cycle impact reductionposted by Helene Lefkowitz on
Does anyone know of companies that will perform an LCA for this credit? Also, I'm looking to get in touch with a project team that has successfully met the LCA option for this credit.