Precertification of EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Charalampos Giannikopoulos on
The International EPD System includes the possibility for pre-certification of EPDs as a step in the process to develop Product Category Rules (PCRs).
Diverse "publicly available" use
NC-v4 LTc4:Surrounding density and diverse usesposted by Gina Rossi on
Working on a NC project on a private college campus and wondering how rigid USGBC is in defining "publicly available".
LEED O&M on a portion of a building
EBOM-v4 MPR3:Must comply with project size requirementsposted by LEED Pro Consultant on
Would a CI project (not LEED) that complies with the MPR's but consists of only a portion of a building (5 levels) be elegible for a LEED O&M certification?
Campus Project Guidance
Schools-NC-v4 LTc6:Bicycle facilitiesposted by Philippa Cameron on
Hi. We have a Campus school project with 4 buildings to be certified under v4, two of which are to be BD+C for Schools and the other BD+C NC.
Renewable Energy Cost Saving for LEEDv4
NC-v4 EAc2:Optimize energy performanceposted by Daniel Ohnuma on
The LEED v4 Guide steps that it's possible only apply any savings from ON-SITE renewable energy systems?
Feedback on test results?
CI-v4 EQc4:Indoor air quality assessmentposted by Joanna Switzer on
Hey all, I've heard informally from one lab that they are seeing a number of v4 projects fail their IAQ tests - appears the newly introduced glycol level thresholds are a common obstacle.
Transportation Planning Handbook
NC-v4 LTc7:Reduced parking footprintposted by Susannah Goddard on
I don't have a copy of this to hand but need to know the content of Tables 18-2 to 18-4.
Natural ventilation openings' control
NC-v4 EQp1:Minimum indoor air quality performanceposted by Ricardo Sá on
According to ASHRAE 62.1 - 2010 User's Manual, example 6-AF, the requirement associated with controls that guarantee that the openeings remain open during occupancy can be met with an administrativ
FAR for parks with pavillion
NC-v4 SSc3:Open spaceposted by nancy picard on
I would like to know if there have ever been special considerations for the FAR calculation, like when considering a municipal pavilion with a park for example?
Question about ASE study area
NC-v4 EQc7:Daylightposted by Jackie Cheung on
Hello everyone. May I ask 2 questions about this credit? A) Assuming a project go for option 1.