Existing Envelop for Baseline case

Schools-NC-v4 EAp2:Minimum energy performance
posted by  John   on 

I am modelling a school building where the new insulation is being added to the existing walls.

3
Default Avatar
LEEDuser Basic Member
0 thumbs up
Mon Jul 10, 2017, 3:16 pm

62MZ calculator in version 4 LEED

NC-v4 EQp1:Minimum indoor air quality performance
posted by  robert feduik  on 

Has this calculator been changed for use in NC-v4 EQp1 versus the one used in LEED 2009? For new construction, are there any other prerequisites or credits that require the use of this tool in th

4
Mon Jul 10, 2017, 11:38 am

Installation of Lighting Posts

EBOM-v4 MRc3:Purchasing - facility maintenance and renovation
posted by  Claire Bannister  on 

We are having two large solar to LED light poles installed in our parking lot. Would this be included in this Facility Maintenance & Renovation credit, as well as "Purchasing- Lamps"?

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Jul 6, 2017, 6:58 pm

Energy Model for Ice Rink

NC-v4 EAp2:Minimum energy performance
posted by  Shenhao Li  on 

Hello, We have a speed skating oval project. Should the energy used for ice rink modeled as process load? We think this will be the major energy consumption.

3
Default Avatar
Atkins
LEEDuser Basic Member
7 thumbs up
Thu Jul 6, 2017, 1:22 pm

Project with no off-street parking spaces

ND-Plan-v4 NPDc5:Reduced parking footprint
posted by  Noriko Nagazumi  on 

Hi, Our project has no off-street parking spaces.

9
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Mon Jun 26, 2017, 4:41 am

Modeling Limitations to the Simulation Program

Data-Centers-NC-v4 EAp2:Minimum energy performance
posted by  Vasileios Kalfountzos  on 

I am currently working on developing the baseline building for our Energy modelling and I'm stuck on the following point of Table G3.1 point 13. "If the simulation program cannot model a component

2
Thu Jun 22, 2017, 1:17 pm

Reduced Truck Idling

Warehouses-NC-v4 LTc8:Green vehicles
posted by  Michelle Rosenberger  on 

Okay first up, I'm confused. The Birds Eye Language above is for the regular New Construction options, not for the Warehouses and Distribution options.

2
Default Avatar
Sustainability Coordinator
DES Architects + Engineers
LEEDuser Basic Member
5 thumbs up
Wed Jun 21, 2017, 5:09 pm

Existing Landscape Area

ND-Plan-v4 GIBc4:Outdoor water use reduction
posted by  Noriko Nagazumi  on 

Hi, Our project has a portion of existing landscaped area within the project boundary.

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Wed Jun 21, 2017, 8:38 am

Manufacturer Inventory

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Jason Grant  on 

Hi Paula - If an engineered wood flooring manufacturer wanted to qualify a product line under Option 1, is it safe to assume that they would just need to publish the list of chemical ingredients of

2
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Mon Jun 19, 2017, 5:02 pm

Showers & Changing Facilities

CS-v4 LTc6:Bicycle facilities
posted by  Edna Urias  on 

We were wondering if a Core & Shell building will be subdivided in a future for 2 tenants, do we have to consider shower facilities at 100 feet from each main entrance ?

4
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Fri Jun 16, 2017, 7:24 pm