Forum quick links
EPDs and Manufacturing Dates
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Michelle Rosenberger on
Does an EPD need to be issued before the manufacturing date of the product installed? Or do we just need to provide an EPD for that product when we submit for certification?
CI in a CS project
CI-v4 LTc2:Surrounding density and diverse usesposted by Sara Johansson on
If a tenant chooses to certify ith CI in an already CS v.4 certified building (that has earned full points for Surrounding Density and DIverse Uses as well as Access to Quality Transit, Bicycle Fac
Leased off-street parking spaces
NC-v4 LTc7:Reduced parking footprintposted by Alicia Villanueva on
Hi! We are working on a project that does not provide any off-street parking on site but parking spaces for employees are leased from 3 nearby parking garages.
Is there a limit to how many products can use the same CSR?
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Alexa Stone on
An industry-wide (generic) EPD can be used for up to 10 products listed within the industry-wide EPD, provided that each application has separately reported impacts within the EPD.
Determining site area on lot with multiple buidings
Mid-Rise-v4 SSc2:Rainwater managementposted by Phil Vanderloo on
Can someone help me with how to determine the total site area for calculations on a lot with an existing residence, and a future LEED certified accessory dwelling.
Errors in Outdoor Water Use Reduction Calculator
EBOM-v4 WEc1:Outdoor water use reductionposted by Stephanie Donovan on
I noticed the worksheet has some errors: a) "Baseline Calculation" tab: the Watering Demand column is subtracting rainfall from ETo, instead of ETo being subtracted from rainfall b) "Baseline Cal
Copy area in office - acoustical treatment
CI-v4 EQc9:Acoustic performanceposted by Leticia SooHoo on
Hi, we are designing an office space which will have a copy area ( 2 to 3 floor model copiers) adjacent to an open office space.
Documentation upload to LEED Online
CS-v4 EAc1:Enhanced commissioningposted by Erin Rowe on
We are just getting ready to submit LEED CI V4 commissioning documents, and I noticed that it only requests that we upload the table of contents for both the Final Cx Report and Ongoing Commissioni
Approved Deicers
EBOM-v4 SSc5:Site managementposted by Stephanie Donovan on
Hi Sam, I've been looking at deicers appropriate for this credit.
Window-sill
NC-v4 EQc8:Quality viewsposted by Antonio Macedo Filho on
I would like to know if there is a maximum obstruction height of views for option 1.