Conveying systems now accepted for this credit
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Paula Melton on
A recent Interpretation states that fire-suppressing equipment and conveying systems now count toward the who
Reduced truck idling
NC-v4 LTc8:Green vehiclesposted by Julia Otero on
In a warehouse to pursue option 2, which characteristics must have external connectors in terms of power and position acording to the loading docks? Thanks!
Functional entryway of project
CS-v4 LTc5:Access to quality transitposted by Martin Stowell on
For this credit, 'functional entry of the project' means from the project boundary or the actual building?
Retail project
EBOM-v4 LTc1:Alternative transportationposted by Charalampos Giannikopoulos on
Should customers of a large retail building selling large items (and hence requiring customers to arrive by car and carry items purchased) be included in the calculations? Thanks!
Building Envelope Seasonal Testing & General Comment
CS-v4 EAc1:Enhanced commissioningposted by Brian Salazar on
Hi! In general, the guidelines for this credit are...very general and vague.
Peak electricity demand
CS-v4 EAc4:Demand responseposted by Tobias Berge on
A LEED v 4 Core & Shell Project in Sweden (office and hotell) will try to apply for this credit.
Monitoring and Inspection of Irrigation System
EBOM-v4 SSc5:Site managementposted by RYAN BEN SABILALA on
For SS Credit Site Management, the performance requirement says: "Monitor irrigation systems manually or with automated systems AT LEAST EVERY TWO WEEKS during the operating season and correct any
Monitoring requirement for Residential Projects
NC-v4 EQp1:Minimum indoor air quality performanceposted by Arpan Bakshi on
Question about meeting this prereq in Residential Projects - v4 requires one of three types of monitoring for naturally ventilated projects - exhaust airflow, alarm on openings, or CO2 with alarm.
On site + Off-site restoration
ND-Plan-v4 SLLc8:Restoration of habitat or wetlands and water bodiesposted by Guillaume Martel on
Our project is redevelopping a contaminated site (whole city block), which is part of a larger urban area belonging to the same owner.
CO2 sensors - "thermal zone"
CS-v4 EQp1:Minimum indoor air quality performanceposted by Jens Apel on
For naturally ventilated spaces in one of my projects it seems that CO2 monitors are the only option applicable. I've got some questions regarding this: 1.