Forum quick links
Paint Certification
NC-v4 EQc2:Low-emitting materialsposted by Rai Galang on
Just want to check if Green guard certification for the paint is approved for the LEED when applying for the Credit instead of Green Seal (GS-11) certification?
Demand Control Ventilation
NC-v4 EAp2:Minimum energy performanceposted by Victoria Watson on
Can you take credit for occupancy sensors that control HVAC systems? I am thinking probably not for system operation E.g setbacks, agree? But I am unsure for the ventilation.
ASHRAE 62.1-2013 Version
NC-v4 EQp1:Minimum indoor air quality performanceposted by Adam Stoker on
Will compliance with the ASHRAE 62.1-2013 standard be acceptable for LEED v4 projects (even though the credit currently references ASHRAE 62.1-2010)?
Scrap as regional material
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Michela Tedeschi on
Hi everyone. Could a scrap of a production process be claimed as regional material, assuming that it is generated and harvested in the same plant (which is, of course less the 160 km from project s
We are in the process of
EBOM-v4 WEp1:Indoor water use reductionposted by LEED Pro Consultant on
We are in the process of certifying a Core and Shell building which does not have a previous LEED certification.
Documentation required
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
Our project is a 26-storey building located in Mexico City with more than 20 tenants. The HVAC consists of AHUs and VAV-boxes with recirculation at the AHU.
Temporary Materials - Formwork
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Christopher Drew on
The materials credits apply to components that are permanently installed in the building.
LEED V4 - TENANT SPACE ENERGY MODELING
Retail-CI-v4 EAp2:Minimum energy performanceposted by Paula Hernandez on
Hi, Regarding the Energy Performance Calculator that should be used instead of Table 1.4, my questions are: 1.
Previously Developed AND Wetlands
NC-v4 LTc2:Sensitive land protectionposted by Becky Johnson on
My building is being constructed on previously developed land, however there is a strip of jurisdictional wetlands on site that we are relocating.
Irrigation Submetering
EBOM-v4 SSp1:Site management policyposted by Ileana Delgado on
Under the Site Management Policy template there is an area on irrigation management which explains the procedure for a proper preventive maintenance, and it mentions: Check for leaks using irrigati